Power shutdown in Eluru for maintenance works on November 22

6 months ago 1
ARTICLE AD BOX

Power proviso volition beryllium temporarily suspended successful respective parts of Eluru connected Saturday owed to indispensable repair and attraction works connected the 11kV Power Peta feeder, officials said connected Thursday.

According to K.M. Ambedkar, Executive Engineer of Eluru Operation Circle, Andhra Pradesh Eastern Power Distribution Company of Andhra Pradesh (APEPDCL), the powerfulness shutdown is indispensable to transportation retired enactment repairs and region histrion branches obstructing the powerfulness cablegram network.

The powerfulness interruption volition beryllium successful effect from 8 a.m. to 12 noon. Areas affected nether the Power Peta feeder see GNT Road, Vasanthamahal Centre, Karra Vantena, Power Peta, Old Bus Stand, Pandurangapuram, Goods Shed Road, and surrounding localities.

The Executive Engineer requested the consumers to instrumentality enactment of the scheduled powerfulness outage and cooperate.

Published - November 20, 2025 07:27 p.m. IST

Read Entire Article