Phalguni river encroachment at Sultan Bathery to be cleared within 10 days, says DC

2 weeks ago 2
ARTICLE AD BOX
Dakshina Kannada Deputy Commissioner H.V. Darshan speaking astatine  a property   league  successful  Mangaluru connected  Monday.

Dakshina Kannada Deputy Commissioner H.V. Darshan speaking astatine a property league successful Mangaluru connected Monday. | Photo Credit: ANIL KUMAR SASTRY

The Mangaluru City Corporation (MCC) has deployed 2 earthmovers to region the debris dumped into the Phalguni (Gurupura) River-bed astatine Sultan Bathery, and the encroachment should get cleared wrong 10 days, said Deputy Commissioner H.V. Darshan connected Monday.

Responding to a question astatine a property league here, Mr. Darshan said, contempt repeated directions to the accused, the Boloor Mogaveera Mahasabha, against which an FIR was besides registered, did not wide the debris for implicit 10 days. As such, the MCC undertook the encroachment removal work. Besides continuing the transgression proceedings against the accused, the medication would retrieve the outgo incurred for removing the encroachment, the Deputy Commissioner said.

To different question astir concerns of artificial/flash floods owed to the coffer bund erected for the operation of the Sultan Bathery-Tannirbhavi Bridge continuing to stay astatine the site, Mr. Darshan said the medication has prepared 2 oregon 3 contingency plans to code the issue. Either implicit removal of the coffer bund oregon removal of ungraded successful betwixt alternate spans would beryllium undertaken earlier the onset of monsoon to guarantee the escaped travel of water, helium said. The Deputy Commissioner said the span would beryllium completed by the 2nd week of July.

Drain desiltation

Meanwhile, the large stormwater drain desiltation enactment undertaken by the MCC was nearing completion, the Deputy Commissioner said, adding that it would substantially trim the hazard of artificial flooding of low-lying areas.

The absorption has been connected shifting the removed silt from drain bunds to different locations truthful that the silt does not travel into the drains again. Also, the medication has formed committees of residents to suggest areas wherever the desiltation needs to beryllium carried out, helium said.

Regarding the artificial flooding successful the Pumpwell area, the Deputy Commissioner said that historically, it has been a low-lying area. The medication has been moving connected raising the tallness of the stormwater drains successful the portion to forestall artificial flooding.

On the encroachment of nationalist road flanks by unauthorised petty shops and sellers, Mr. Darshan said the medication has already received inputs from the National Highways Authority of India astir the achromatic spots connected NHs 66, 75, 73 and 169 successful the district. The aforesaid would beryllium cleared by the section authorities.

Published - May 18, 2026 07:30 p.m. IST

Read Entire Article