Bondada Engineering connected Monday announced the receipt of aggregate orders from the Adani Group aggregating to ₹469.52 crore for the execution of the Balance of System (BOS) bundle for a 250-MW star powerfulness task astatine Khavda (Kutch, Gujarat).
The orders person been awarded by Adani Green Energy and Adani Green Energy Six and impact the proviso of goods and onsite services for the BOS package. The task is scheduled to beryllium executed wrong 8 months from the receipt of the order, Bondada said successful a release.
With the latest order, its cumulative task capableness with Adani Group has reached to astir 1GW, further strengthening its presumption successful the country’s rapidly expanding renewable vigor infrastructure sector, the Hyderabad-based institution said.
“This bid reinforces our beardown and increasing concern with the Adani Group and reflects the spot placed successful Bondada Engineering’s execution capabilities successful the renewable vigor sector,” Bondada Group CMD Bondada Raghavendra Rao said.

2 weeks ago
1
