What India did to protect its forests and hills in 2025: from Kancha Gachibowli to Aravalli

5 months ago 1
ARTICLE AD BOX

From Kancha Gachibowli to Aravalli to Hasdeo, the twelvemonth 2025 saw radical coming successful ample numbers to protestation against the threats of mining and deforestation. While the Supreme Court’s bid connected retrospective biology clearances triggered statement connected fundamentals of biology jurisprudence, government’s argumentation connected atomic mineral mining was besides recovered to beryllium successful struggle with involvement of ecologically fragile and highly susceptible coastal lands.

Protest implicit centre’s caller explanation of Aravalli hills

The Supreme Court’s acceptance of the caller azygous explanation of the Aravali Hills and Ranges triggered a monolithic protestation starting from December, successful Rajasthan, Delhi, and Haryana. 

According to the caller definition, “Aravali Hill” volition beryllium defined arsenic immoderate landform successful designated Aravali districts with an elevation of 100 metres oregon supra its section alleviation and an “Aravali Range” volition beryllium a postulation of 2 oregon much specified hills wrong 500 metres of each other. The Bench accepted the recommendations for sustainable mining and the steps to beryllium taken for preventing amerciable mining successful Aravali Hills and Ranges.

Protesters fearfulness this caller explanation lone protects hills higher than 100 metres from mining, and would permission the remaining hills — the 700 km scope spanning from Haryana to Gujarat, with the bulk of it successful Rajasthan —unprotected from menace of mining.

Also read: Government fails to specify Aravallis contempt implicit a year’s effort

The Supreme Court connected December 29, kept in abeyance its November 20 judgement upholding a government expert sheet explanation connected Aravalli.

Students show  banners during a protestation  for the extortion  of the Aravalli Hills astatine  Jawaharlal Nehru University, successful  New Delhi, Son aturday, Dec. 27, 2025.

Students show banners during a protestation for the extortion of the Aravalli Hills astatine Jawaharlal Nehru University, successful New Delhi, Son aturday, Dec. 27, 2025. | Photo Credit: PTI

Students protestation to prevention Kancha Gachibowli wood successful Hyderabad

In March 2025, students of University of Hyderabad (UoH) started protesting against the auction of 400 acres of onshore of Kancha Gachibowli forest. Students stated that the onshore is portion of the university, a assertion which has been vehemently denied by the government.

Environmentalists said the onshore is location to a affluent assortment of autochthonal flora and fauna. They pointed retired deficiency of required permissions for felling greenery, and the lack of an Environmental Impact Assessment which is mandatory for specified projects.

In April, the Supreme Court stalled cleaning of the wood area and directed the Telangana Wildlife Warden to instrumentality contiguous steps to support the wildlife affected by the demolition of 100 acres of the Kancha Gachibowli “forest” area, telling the State authorities that it could not person “high-rises successful the institution of deer”.

BJP and Congress veterans articulation environmentalists to support the Himalayas

In September 2025, seasoned BJP person and erstwhile Union Minister for Human Resource Development Murli Manohar Joshi and Congress seasoned and Rajya Sabha subordinate Karan Singh, on with respective environmentalists and scientists appealed to the Supreme Court to reappraisal its 2021 judgement permitting widening of Himalayan roads, portion of the Chardham project, beyond 5.5 metres.

Overseen by the Ministry of Road Transport and Highways, the task involves widening upland roads, including those successful the Bhagirathi Eco Sensitive Zone, and those starring up to India’s borderline with China.

However, environmentalists person argued that cutting elevation slopes and the resulting debris are damaging to the eco-system and worsen the interaction of landslides and torrential rains arsenic good arsenic origin monolithic roadblocks and pile-up connected these upland roads.

Rampant cutting of the hills adjacent   Rudraprayag for the Char Dham project, a projected  two-lane expresses of National Highway with a minimum width of 10 metres. Char Dham task  consists of widening and repairing 889-kilometres of nationalist  highways starring  to revered shrines of Kedarnath, Badrinath, Gangotri and Yamunotri successful  Uttarakhand.

Rampant cutting of the hills adjacent Rudraprayag for the Char Dham project, a projected two-lane expresses of National Highway with a minimum width of 10 metres. Char Dham task consists of widening and repairing 889-kilometres of nationalist highways starring to revered shrines of Kedarnath, Badrinath, Gangotri and Yamunotri successful Uttarakhand. | Photo Credit: KRISHNAN VV

Supreme Court recalling verdict connected retrospective biology clearances

The Supreme Court, successful a bulk judgement connected November 18, 2025, recalled its May 16 judgment which declared that the assistance of ex station facto or retrospective Environmental Clearances by the Centre to gathering projects and constructions was a “gross illegality” and an “anathema”.

Justice Ujjal Bhuyan recorded a crisp dissent successful his 97-page opinion. He termed the reappraisal judgement an “innocent look of opinion” which overlooked the “very fundamentals of biology jurisprudence”.

The May judgement had held that granting retrospective clearances successful immoderate signifier to regularise amerciable constructions was intelligibly illegal.

In an editorial The Hindu states that post-facto clearances tin lone enforce penalties, prescribe mitigation oregon bid closure oregon demolition.

Also read: Wildlife First writes to Karnataka authorities to cull Kudremukh Iron Ore Company Limited’s connection for ex-post facto wood clearance

Exemption of atomic mineral mining from nationalist consultation

The Impact Assessment Division of the Union Ministry of Environment, Forest and Climate Change announced successful September 2025 done an bureau memorandum that nationalist consultation is not required for the projects for mining of atomic minerals, notified successful Part B, and captious and strategical minerals, notified successful Part D, of the First Schedule of the Mines and Minerals (Development and Regulation) Act.

Tamil Nadu Chief Minister M.K. Stalin urged Prime Minister Narendra Modi to retreat the bureau memorandum, expressing his interest for Rare Earth Elements embedded successful the ecologically-fragile and highly susceptible formation soil systems successful coastal Tamil Nadu.

In a written reply successful Lok Sabha, Union Minister of State for Environment, Kirti Vardhan Singh, successful December 2025, informed the State authorities that the exemption was issued nether an already existing proviso of the EIA Notification, Clause 7(III)(i)(f), which allows projects relating to nationalist defence, information oregon different strategical considerations to beryllium exempted from nationalist consultation.

Forest clearance for mining task successful Hasdeo

In August 2025, the Chhattisgarh authorities approved wood clearance for a mining project successful ecologically delicate Hasdeo Aranya. The task perchance paves the mode for the felling of 4.5 lakh trees, drafting disapproval from Opposition parties and environmentalists.

Demanding its cancellation, the Opposition person accused the ruling BJP of sacrificing the interests of the radical of the State arsenic good arsenic ecological concerns “for the payment of their capitalist friends”.

Local residents submitted arsenic galore arsenic 1,623 idiosyncratic objection letters during a nationalist proceeding for biology clearance.

In 2022, the Chhattisgarh Legislative Assembly unanimously passed a backstage subordinate solution urging the Centre to cancel allocation of each ember mining blocks successful the ecologically delicate country of Hasdeo Aranya.

Protest against mining successful Hasdeo wood and the resultant deforestation dates backmost to 2011 erstwhile the Ministry of Environment, Forest and Climate Change granted clearance for the mining for a ember block. According to People’s Union for Civil Liberties, the Indian authorities has identified 23 ember blocks wrong the wood area.

The sit-in protestation  tract  astatine  the entranceway  to Hariharpur village, wherever  the Hasdeo Arand Bachao Sangharsh Samiti has gathered each   time  since March 2, 2022. In achromatic  shirt, Muneshwar Singh Porte, a subordinate   of Samiti and nonmigratory  of Fattepur village.

The sit-in protestation tract astatine the entranceway to Hariharpur village, wherever the Hasdeo Arand Bachao Sangharsh Samiti has gathered each time since March 2, 2022. In achromatic shirt, Muneshwar Singh Porte, a subordinate of Samiti and nonmigratory of Fattepur village. | Photo Credit: A.M.Faruqui

Cancellation and ‘disappearance’ of wood rights of villagers successful Chhattisgarh

While talking astir wood conservation, the relation of wood dwellers and adivasi communities are often ignored.

In October 2025, the Chhattisgarh High Court has dismissed a petition challenging the cancellation of assemblage forest rights granted to villagers of Ghatbarra successful the Hasdeo Aranya forest, wherever Adani Enterprises-owned entity is operating the Parsa East and Kete Basen ember mines.

In 2016, the District-Level Committee (DLC) successful Surguja territory cancelled assemblage wood rights titles rights granted successful 2013, noting that this was erroneously granted arsenic the spot of onshore fell nether mining areas, for which diversion of wood was already approved successful 2012. 

Forest Rights Act, 2006 recognises and vests rights to usage forests to Scheduled Tribe and different forest-dwelling communities.

In August, The Hindu reported that thousands of wood rights titles distributed crossed astatine slightest 3 districts successful Chhattisgarh look to person disappeared from the records of the State government’s Tribal Welfare Department astatine assorted points implicit the preceding 17 months. As per the FRA, erstwhile titles are granted, they are neither transferable nor alienable but tin lone beryllium inherited.

Protest against Siang Upper Multi-Purpose Project (SUMP) successful Arunachal Pradesh

Villagers from 3 districts of cardinal Arunachal Pradesh successful May 2025, launched an indefinite sit-in against the 11,000-megawatt Siang Upper Multi-Purpose Project. Villagers stopped a pre-feasibility study and survey enactment for the hydroelectric project. The protesting women said the task volition rob them of their ancestral onshore and livelihood. The villagers said they, nether the banner of the Siang Indigenous Farmers Forum, person been opposing dams since the aboriginal 1980s.

Protest against ember mining turns convulsive successful Chhattisgarh’s Surguja

A unit broke retired arsenic villagers protested against mining successful Chhattisgarh’s Surguja successful December 2025. The protesters, residents of Parsodi Kala village, were opposing the Amera hold ember task of the South Eastern Coalfields Limited, a subsidiary of Coal India Limited. The protesters alleged onshore grabbing.

Land for agriculture was their lone root of livelihood and it was being taken away, which they opposed, immoderate protesters said. Leelavati, a protester, said she would not springiness up her land. “We emotion our onshore and bash not privation to springiness it away. SECL volition get coal, but what volition hap to us?”

The fearfulness of ‘irreversible’ interaction connected Great Nicobar Island project

In October 2025, much than 70 scholars, erstwhile bureaucrats, activists, lawyers, and environmentalists wrote an open missive responding to Environment Minister Bhupender Yadav’s defence of the projected ₹92,000-crore Great Nicobar Island mega-infrastructure project, urging the Minister to “set speech governmental considerations” and absorption connected the project’s “grave and irreversible antagonistic implications”.

Great Nicobar task involves the operation of a trans-shipment port, an planetary airport, a township, and a powerfulness works connected much than 160 sq. km of land.

Also read:Great Nicobar Island project: representation acceptable for denotification of tribal reserve

The signatories alleged that the Environmental Appraisal Committee ignored anthropological and ecological objections.

The Hindu reported that the Tribal Council of Little Nicobar and Great Nicobar has said successful a ailment to the Minister of Tribal Affairs successful August 2025, that wood clearance was granted for the task done a mendacious practice to the Centre by Andaman and Nicobar Islands administration, claiming that rights of the tribal radical nether the Forest Rights Act, 2006, had been “identified and settled”.

Read Entire Article