Visakhapatnam Port Authority (VPA) chairperson, M. Angamuthu, connected Monday inaugurated a suite of developmental projects and laid instauration stones for high-tech information enhancements astatine the larboard premises.
The projects included commissioning of a caller Port Operation System and a 170 kW rooftop star works astatine the Sewage Treatment Plant (STP), the second marking different measurement successful the port’s modulation toward sustainable energy.
Mr. Angamuthu besides inaugurated a nationalist promenade and a 38 Track Kilometre (TKM) electrification task for railway tracks, aimed astatine improving some the aesthetic entreaty of the larboard and its interior logistical efficiency.
Other infrastructure projects completed see the upgradation of the MCHV railway track, rectification of crisp curves connected existing tracks, and repairs on the SL Canal Jetty. A caller show corridor successful the administrative bureau gathering and a customs bound partition were besides unveiled to the public.
Focusing connected the port’s information apparatus, instauration stones were laid for the installation of Under Vehicle Scanning Systems (UVSS) crossed each introduction points. Furthermore, radiological detection instrumentality volition beryllium deployed astatine cargo gates to show incoming shipments for hazardous materials.
The chairperson besides acceptable successful question roadworthy restoration works, including the regrading of the bituminous roadworthy aboveground from Convent Junction Arch to H-7 Junction and interior roadworthy improvements wrong the OHC area

1 month ago
4






