Vande Bharat Express between Bengaluru and Goa proposed with 13-hour journey time

3 months ago 2
ARTICLE AD BOX
Mangaluru Central-Madgaon VB Express successful  Mangaluru. The South Western Railway (SWR) has projected  a Vande Bharat Express betwixt  Bengaluru and Madgaon.

Mangaluru Central-Madgaon VB Express successful Mangaluru. The South Western Railway (SWR) has projected a Vande Bharat Express betwixt Bengaluru and Madgaon. | Photo Credit: ANIL KUMAR SASTRY

Close connected the heels of Railway Minister Ashwini Vaishnaw announcing instauration of a coastal Vande Bharat Express service, the Railway Ministry has projected a work betwixt Yesvantpur successful Bengaluru and Madgaon successful Goa via Mangaluru railway region.

According to the proposal, the work volition skip Mangaluru Junction and Mangaluru Central stations, and volition tally via Padil. The moving clip successful each absorption would beryllium astir 13 hours.

The South Western Railway (SWR), successful a note, stated that if the VB has to tally via Mangaluru Junction, moving clip has to beryllium increased.

Two VB rakes would person to beryllium deployed for the service, 1 each starting from Yesvantpur and Madgaon successful the greeting to scope their destinations successful the evening.

Tentative timetable

As per the tentative schedule, the Yesvantpur-Madgaon Vande Bharat Express volition depart Yesvantpur (in Bengaluru) astatine 6.05 a.m., scope Padil astatine 2 p.m. and get successful Madgaon astatine 7.15 p.m., taking a full of 13.10 hours.

The Madgaon-Yesvantpur Vande Bharat Express is scheduled to depart Madgaon successful Goa astatine 5.30 a.m. and scope Padil astatine 11 a.m. The bid volition get successful Yesvantpur astatine 6.40 p.m., taking a full of 13.10 hours.

The Railway Ministry noted that the mean velocity of the work is little than 50 kmph. However, SWR stated the velocity could beryllium accrued station enhancing the velocity bounds betwixt Chikka Banawara and Hassan from 110 kmph to 130 kmph, and connected Sakleshpur-Subrahmanya Road Ghat conception from 30 kmph to 40 kmph.

What is stopping SWR from opening proceedings run

Before finalising the schedule, SWR said proceedings runs would person to beryllium conducted utilizing 2 VB rakes with Automatic Emergency Braking (AEB) system. The overhead electrical instrumentality (OHE) strategy successful the precocious electrified Hassan-Thokur (Mangaluru) conception has to beryllium certified and energised for conducting the trials, SWR stated.

The timings of the work person been arrived astatine by accounting for restrictions connected the Sakleshpur Ghat section, including velocity bounds of 30 kmph, and crossing of trains

3 hours for Bengaluru-Hassan bid journey

The SWR has allocated astir 3 hours (2.55 hours) for the projected VB Express connected the Yesvantpur-Hassan-Yesvantpur conception (174 km) whereas the KSR Bengaluru-Kannur-KSR Bengaluru Express (16511/12) traverses this region successful 2.45/3 hours, and KSR Bengaluru-Karwar-KSR Bengaluru Panchaganga Express (16595/96) covers the conception successful 2.30 hours.

Published - February 19, 2026 02:31 p.m. IST

Read Entire Article