UPC Volt to set up AI ready data centre at Telangana’s Bharat Future City; ₹5,000 crore investment over 5 years estimated

4 months ago 3
ARTICLE AD BOX
Telangana delegation with UPC Volt astatine  World Economic Forum (WEF) gathering  successful  Davos, Switzerland

Telangana delegation with UPC Volt astatine World Economic Forum (WEF) gathering successful Davos, Switzerland | Photo Credit: BY ARRANGEMENT

UPC Volt, a associated task betwixt Netherlands-based partners UPC Renewables Group and VOLT Data Centres, has announced its determination to found 100 MW AI acceptable information centre astatine the Bharat Future City, connected Hyderabad outskirts.

The task volition beryllium supported by a 100 MW RTC renewable vigor task facility, with the volition of ensuring that integer infrastructure is powered by carbon-free energy. This installation is estimated to necessitate an concern of ₹5,000 crore implicit a five-year period. It is expected to make much than 3,000 nonstop & indirect jobs during operation and implicit 800 nonstop and indirect jobs during operation.

The Telangana Rising delegation led by Chief Minister A. Revanth Reddy clinched the deal during a gathering with the UPC Volt enactment successful Davos connected Thursday (January 22, 2026). A Memorandum of Understanding (MoU) was signed successful this regard, and the installation would beryllium integrated with renewable vigor sourcing nether Telangana’s greenish unfastened entree framework, enabling a sustainable and powerfulness archetypal operating model.

The Telangana Rising delegation engaged successful a affirmative dialog with Volt CEO Han de Groot; UPC Renewables APAC co-founder Steven Zwaan and UPC Renewables India CEO Alok Nigam successful Davos. The Chief Minister said the State Government was committed to pursuing the extremity of reaching $3 trillion system by 2047 by gathering high-calibre integer infrastructure on the roadmap for achieving nett zero development.

Industries and IT Minister D. Sridhar Babu said the State was aggressively pushing to go a planetary AI information centre hub done incentives for components similar high-density GPUs, ample standard grooming compute and liquid cooling. Accordingly, Telangana was creating 3 chiseled economical zones dedicated to work sector, manufacturing and agriculture.

Published - January 22, 2026 04:09 p.m. IST

Read Entire Article