The imaginativeness papers of the Karnataka Digital Economy Mission (KDEM) for Mangaluru Cluster, comprising Dakshina Kannada, Udupi, Uttara Kannada and Kodagu districts, has said that undersea cablegram connectivity volition beryllium a captious enabler to fortify Mangaluru’s positioning arsenic a planetary information halfway hub.
Direct landing stations and subsea cablegram routes volition supply low-latency, high-capacity planetary bandwidth, making the hub globally competitory for hyperscalers, unreality providers, and AI-driven enterprises, the papers said.
Cable way options
The papers projected 3 cablegram way options. Referring to the archetypal option, it said Middle East and Europe way (Oman/UAE → Mangaluru → onward to Chennai/Singapore) volition supply nonstop low-latency way from West Asia and Europe, bypassing congested Mumbai landing stations.
The 2nd option, South East Asia hold way (Singapore → Colombo → Mangaluru → onward to Middle East/Africa) provides a Bangaluru+1 backup for hyperscalers, routing postulation to Southeast Asia.
The 3rd enactment mentioned is determination loop with Kochi and Chennai (Chennai <–> Kochi <–> Mangaluru which is terrestrial + subsea loop).

The imaginativeness papers of the Karnataka Digital Economy Mission (KDEM) for Mangaluru Cluster has pointed retired that enabling undersea cable connectivity assistance Mangaluru arsenic a planetary information halfway hub. | Photo Credit: SPECIAL ARRANGEMENT
Mangaluru to complement Bengaluru
Aiming to establishing Mangaluru arsenic a planetary AI information centre hub. the papers said KDEM, nether its Beyond Bengaluru initiative, envisions positioning Mangaluru arsenic a strategical hub for next-generation information centers. Leveraging its coastal advantage, emerging integer infrastructure, renewable vigor ecosystem, and endowment base, Mangaluru volition complement Bengaluru arsenic a ‘Bengaluru+1’ determination portion serving arsenic a resilient backup tract for planetary capableness centers (GCCs).
Job instauration
Establishing the Mangaluru information centre hub is expected to make implicit 25,000 nonstop and indirect jobs crossed aggregate sectors, the papers released by Priyank Kharge, Minister for Electronics, Information Technology, Bio-technology successful the metropolis connected September 24, 2025, said.
Employment instauration includes 8,000 jobs successful operation and infrastructure assemblage (civil works, electrical, cooling, logistics); 7,000 jobs successful IT/BT and unreality services (data halfway operations, AI infra management, unreality engineering); 5,000 jobs successful operations and attraction (facilities management, powerfulness systems, security); 3,000 jobs successful renewable vigor and utilities (green powerfulness projects, grid integration, cooling solutions); and 2,000 jobs successful ancillary and allied industries (transport, food, services, SMEs successful the information centre ecosystem).
Giga standard information centre
The 54-page papers said that Mangaluru is envisioned arsenic a giga-scale information halfway cluster, with planned capableness exceeding 1 GW implicit the adjacent decade.
“The ‘Grid-to-Chip’ strategy ensures integration of renewable vigor (wind, solar, hydro) with precocious cooling, high-density compute, and chip-level optimisation for AI and unreality workloads,” it said.

8 months ago
2



