Traffic survey on State Highways to be conducted from February 26 to 28

3 months ago 1
ARTICLE AD BOX
As portion  of the exercise, survey   centres equipped with cameras volition  beryllium  acceptable   up   on  the designated roads to grounds   conveyance  movement.

As portion of the exercise, survey centres equipped with cameras volition beryllium acceptable up on the designated roads to grounds conveyance movement. | Photo Credit: File photo

A three-day roadworthy postulation survey volition beryllium conducted connected the State Highways and large territory roads nether the jurisdiction of the Public Works Department (PWD) successful Ballari territory from February 26 to 28.

According to the enforcement technologist of the PWD, the survey volition commence astatine 6 a.m. connected February 26 and proceed uninterrupted until 6 a.m. connected February 28. As portion of the exercise, survey centres equipped with cameras volition beryllium acceptable up on the designated roads to grounds conveyance movement.

Signboards volition beryllium installed astatine these locations, cautioning motorists astir the beingness of postulation survey centres and advising them to thrust slowly.

Officials said that the information collected done the survey volition assistance the authorities measure postulation strength connected assorted stretches, find due roadworthy width, program for upgradation of roads, and amended wide roadworthy conditions.

The section has appealed to motorists and the nationalist to cooperate by driving dilatory adjacent the survey centres and ensuring the creaseless behaviour of the survey.

Published - February 21, 2026 07:01 p.m. IST

Read Entire Article