Toll collection on Kozhikode bypass from January 1 is only a trial run, says NHAI

4 months ago 2
ARTICLE AD BOX
Congress activists signifier    a protestation  successful  beforehand   of the Pantheerankavu toll plaza against the reported determination   to cod  toll connected  the Kozhikode bypass.

Congress activists signifier a protestation successful beforehand of the Pantheerankavu toll plaza against the reported determination to cod toll connected the Kozhikode bypass. | Photo Credit: K. Ragesh

Even arsenic the Congress enactment staged a protestation connected Wednesday against the instauration of toll connected the Kozhikode bypass, the National Highways Authority of India (NHAI) has clarified that the reported postulation commencing connected January 1 is conscionable a full-fledged proceedings run.

A last determination connected imperishable implementation remains pending till the 28.4-km Ramanattukara–Vengalam agelong of the NH 66 is afloat completed. Besides, it has to acquisition respective ceremonial procedures, including nationalist notification and consultations with instrumentality enforcement agencies including the police.

Raj Lal Singh, an NHAI official, told The Hindu that the authorization had been conducting adust runs for immoderate clip and volition clasp a full-scale proceedings tally connected January 1 to measure readiness. “We are investigating facilities, equipment, manpower deployment, and strategy preparedness. Actual toll postulation volition statesman lone aft completing each ceremonial procedures,” helium said.

The toll postulation would commence lone aft issuing a ceremonial notification, coordinating with the police, informing the nationalist successful advance, and completing different statutory requirements nether the National Highway Fee Rules, Mr. Singh said.

The clarification came aft reports carried by a conception of the media said that toll postulation would statesman connected January 1 astatine the Olavanna toll plaza. These reports triggered protests by the Congress party, which staged a objection successful beforehand of the Pantheerankavu toll plaza. District Congress Committee president K. Praveenkumar inaugurated the protestation successful the morning.

Meanwhile, Congress person and Kozhikode MP, M.K. Raghavan, wrote to Road Transport and Highways Minister Nitin Gadkari, opposing toll postulation and describing the determination arsenic “illegal” successful presumption of the incomplete operation of the NH-66 bypass.

In a property release, helium said toll postulation could not beryllium justified erstwhile basal infrastructure remained unfinished and argued that imposing tolls earlier completing operation works and work roads was against the provisions of the National Highway Fee Rules.

Mr. Raghavan besides pointed retired that operation enactment was inactive nether mode astatine respective locations, including Korappuzha, Malaparamba, and Mampuzha, and said that the lack of continuous work roads had already caused hardship to section residents and traders.

Under the projected interest operation for toll collection, cars and tiny vehicles volition beryllium charged ₹90 for a azygous travel and ₹135 for a instrumentality travel wrong 24 hours. Larger vehicles, including buses and trucks, pull higher charges, with rates going up to ₹575 for a azygous trip. Residents surviving wrong a 20-km radius of the toll plaza tin avail monthly passes for unlimited question astatine ₹340.

Published - December 31, 2025 08:51 p.m. IST

Read Entire Article