Tiruchi Corporation appoints consultant for bio-CNG plant at Ariyamangalam

3 days ago 1
ARTICLE AD BOX
Non-biodegradable adust  discarded  from astir  450 tonnes of garbage collected regular  successful  Tiruchi metropolis  is transported to the dumpyard astatine  Ariyamangalam for processing.

Non-biodegradable adust discarded from astir 450 tonnes of garbage collected regular successful Tiruchi metropolis is transported to the dumpyard astatine Ariyamangalam for processing. | Photo Credit: FILE PHOTO

Tiruchi Corporation has appointed a task absorption advisor to oversee and expedite the implementation of the upcoming bio-compressed earthy state (Bio-CNG) works astatine the Ariyamangalam dump yard.

According to officials, the advisor volition show the project’s execution, guarantee that prime standards are maintained during construction, and supervise the facility’s operations for 3 years aft commissioning. A Chennai-based steadfast has been selected, and a sum of ₹48.49 lakh has been sanctioned for the purpose.

The Bio-CNG works was projected successful 2023 nether the Swachh Bharat Mission 2.0 arsenic portion of the Corporation’s efforts to alteration the decades-old Ariyamangalam dumpyard into a sustainable waste-processing hub. The project, estimated to outgo ₹30.78 crore, is to beryllium developed connected 4 acres of reclaimed onshore wrong the dumpyard premises.

Officials said the task was indispensable amid the rising substance request and the request for sustainable vigor alternatives., and the assignment of a advisor would guarantee the timely and businesslike execution of the facility.

Once operational, the installation would process 100 tonnes of biodegradable bedewed discarded generated regular and person it into compressed earthy state (CNG). The state produced is expected to beryllium utilized arsenic substance for vehicles.

At present, the Corporation has outsourced the collection, segregation, transportation, and processing of municipal coagulated discarded from each 65 wards to a backstage agency. Around 400 to 450 tonnes of coagulated discarded are generated and collected each time crossed the city.

While non-biodegradable adust discarded is transported to the dumpyard for processing, segregated bedewed discarded is handled astatine 36 micro-composting centres operated by the Corporation. The projected Bio-CNG installation is expected to heighten the city’s waste-processing capableness by converting integrated discarded into a invaluable vigor resource.

A contractor had been identified to instrumentality the task nether the public-private concern (PPP) model. The works would beryllium developed nether the Design, Build, Finance, Operate and Transfer (DBFOT) model, with preliminary enactment expected to commence shortly.

Published - June 04, 2026 07:02 p.m. IST

Read Entire Article