Bengaluru’s greeting rush-hour postulation faced large disruption connected October 30 aft a Namma Metro bid developed a method snag betwixt Vijayanagar and Hosahalli stations astir 9.15 a.m., starring to the suspension of services connected the Purple Line betwixt Kempegowda (Majestic) metro presumption and Challagatta.
The disruption had a cascading effect connected the Green Line, affecting thousands of commuters crossed the city.
According to the Bangalore Metro Rail Corporation Limited (BMRCL), bid services up to Mysuru Road were restored by 10.15 a.m. portion mean operations betwixt Mysuru Road and Challagatta resumed astir 11 a.m. The BMRCL apologised for the inconvenience.
Passengers described chaotic scenes wrong trains and stations during the disruption.
“When I boarded the bid astatine Mysuru Road metro presumption astir 9.40 a.m., determination were radical who had been trying to scope their destinations since 8.40 a.m.,” said Pavithra S, a regular commuter.
Another commuter, Shashi Kumar, said that trains were stranded betwixt Attiguppe and Vijayanagar, with packed coaches and small accusation from staff. “The bid was jam-packed aft operations resumed. This isn’t the archetypal clip BMRCL has faced specified method issues. A elaborate probe should beryllium conducted to forestall specified breakdowns,” helium said.

7 months ago
2







