Sulthan Bathery-Tannirbavi bridge project: MSCL to launch jacking up of 900 tonnes weighing bowstring girder this week

3 weeks ago 1
ARTICLE AD BOX
The bowstring girder assembled connected  the coffer bund built connected  the Phalguni.

The bowstring girder assembled connected the coffer bund built connected the Phalguni. | Photo Credit: H.S. MANJUNATH

With the Sulthan Bathery-Tannirbavi span project, which volition bring Tannirbavi formation person to the city, nether progress, Mangaluru Smart City Ltd. (MSCL), which is implementing the project, volition motorboat the captious cognition of jacking up of bowstring girder, weighing astir 900 tonnes, this week.

Lifting the 100-m agelong girder, which is 1 unit, and placing it astatine the centre of the span is simply a important portion of the ₹64-crore task taken up by MSCL nether the Smart City Mission.

K. Arun Prabha, wide manager (Technical), MSCL, told The Hindu that the girder volition beryllium lifted from the coffer bund built connected the Phalguni [the Gurupura] to a tallness of astir 11 m and aboriginal lowered by astir a metre and placed connected the pier support.

Published - May 05, 2026 07:48 p.m. IST

Read Entire Article