Prime Minister Narendra Modi connected Sunday (March 8, 2026) inaugurated 2 caller Delhi Metro corridors and laid instauration chromatic for 3 much metro lines, providing nonstop connectivity to respective important locations successful New Delhi.
He besides inaugurated and laid the instauration chromatic of projects worthy ₹15,200 crore nether the cardinal government's General Pool Residential Accommodation (GPRA) redevelopment plan.
The full outgo of each projects is astir ₹33,500 crore.
We are committed to gathering a modern and Viksit Delhi. The projects launched contiguous volition fortify infrastructure, amended connectivity and heighten the easiness of surviving for radical of the city.
https://t.co/BrUJqDQj50
The 2 caller Delhi Metro corridors inaugurated by the Prime Minister were the Majlis Park-Maujpur Babarpur (Pink Line) corridor of astir 12.3 km and the Deepali Chowk-Majlis Park (Magenta Line) corridor of astir 9.9 km.
These corridors volition payment respective areas of Delhi, including Burari, Jagatpur-Wazirabad, Khajuri Khas, Bhajanpura, Yamuna Vihar, Madhuban Chowk, Haiderpur Badli Mor, Bhalaswa and Majlis Park.
Mr. Modi laid the instauration chromatic for 3 caller corridors nether Phase V-A of the Delhi Metro, covering a way magnitude of astir 16.1 km.
The 3 caller corridors are R.K. Ashram Marg to Indraprastha, Aerocity to Indira Gandhi Airport Terminal-1 and Tughlakabad to Kalindi Kunj.
These corridors volition supply nonstop connectivity to respective important locations successful the superior and amended connectivity for those travelling betwixt Noida, southbound Delhi and the airport.

2 months ago
1





