Odisha Cabinet clears ₹17,250-cr Kalyani Group manufacturing complex in Dhenkanal

3 months ago 1
ARTICLE AD BOX
The integrated automotive, aerospace and defence manufacturing analyzable  was approved aft  a Cabinet gathering  chaired by Odisha Chief Minister Mohan Charan Majhi connected  Saturday. File

The integrated automotive, aerospace and defence manufacturing analyzable was approved aft a Cabinet gathering chaired by Odisha Chief Minister Mohan Charan Majhi connected Saturday. File | Photo Credit: THEHINDU

Odisha Chief Minister Mohan Charan Majhi chaired a Cabinet gathering connected Saturday (January 31, 2026), approving an integrated automotive, aerospace and defence equipment-component manufacturing analyzable projected by Kalyani Group successful Dhenkanal district, involving an estimated concern of ₹17,250 crore.

The project, to beryllium developed implicit 1,100 acres astatine Gajamara, volition see a speciality alloy portion by Kalyani Steel, a ace alloy task by Saarloha Advanced Materials Private Limited, and an concern constituent casting and forging portion by Bharat Forge, the State Government said successful a statement.

Addressing a property league aft the Cabinet meeting, Chief Secretary Anu Garg said the task is expected to make much than 4,800 nonstop and astir 5,500 indirect jobs during operation and archetypal operations, with full employment projected to transcend 20,000 arsenic vendor parks and ancillary ecosystems standard up.

The authorities said the task would fortify Oaisha’s presumption successful strategical materials specified arsenic titanium and speciality steel, boost downstream worth summation wrong the State, and trim dependence connected imports for captious components and precocious materials.

The clump model, with co-located accumulation units and vendor parks, is expected to amended competitiveness done shared infrastructure, logistics efficiencies, and streamlined compliance support, resulting successful faster scaling and higher productivity.

In different important decision, the Cabinet approved the continuation of planetary flights with the State’s viability spread backing (VGF) support.

The connection relates to planetary operations presently undertaken by lndiGo, covering routes connecting Bhubaneswar with Dubai and Singapore, which were initiated earlier with State VGF enactment to code archetypal commercialized viability gaps was approved.

“The VGF enactment is projected for six much months (October 27, 2025, to March 29, 2026) nether the caller destination policy, considering the crisp diminution successful rider load origin aft withdrawal of earlier enactment and the hazard of way discontinuation,” the authorities said.

Published - January 31, 2026 06:35 p.m. IST

Read Entire Article