NOC not mandatory to open the Mahakalipadpu RuB as claimed by Mangaluru Smart City, says Railways

5 months ago 1
ARTICLE AD BOX
While determination   are nary  signs of the aboriginal  opening   of the Mahakalipadpu duplicate  Railway Underbridge (RuB) for postulation   connected  Saturday, January 3, the Southern Railway has said No Objection Certificate from Railways is not mandatory to unfastened  the RuB for postulation   successful  Mangaluru.

While determination are nary signs of the aboriginal opening of the Mahakalipadpu duplicate Railway Underbridge (RuB) for postulation connected Saturday, January 3, the Southern Railway has said No Objection Certificate from Railways is not mandatory to unfastened the RuB for postulation successful Mangaluru. | Photo Credit: ANIL KUMAR SASTRY

Southern Railway’s Palakkad Division connected Friday, January 2, said, “The petition for a No Objection Certificate [NOC], arsenic claimed by the section authorities, is not a mandatory request from the Railways for opening the Railway Under Bridge [RuB] to nationalist traffic.”

The Division was responding to a quality article, titled “Mahakalipadpu duplicate RuB opening caught successful bureaucratic hassles”,which appeared successful The Hindu columns connected January 1, concerning the Mahakalipadpu duplicate Railway Underbridge astatine Jeppu missing 1 much deadline.

The railways said, “The Railway information of the enactment has already been completed, and arsenic per established procedure, the installation tin beryllium opened for nationalist usage by the acrophobic authorities erstwhile the remaining attack and allied works nether their jurisdiction are completed and statutory requirements are complied with.”

It said that the clarification is being issued to dispel the content that the opening of the duplicate RuB has been delayed owed to hurdles oregon inaction connected the portion of the Railways. There person been nary procedural delays, administrative hurdles oregon intentional hold-ups from the Railway.

Works completed successful Railway jurisdiction

The Division said each works wrong the jurisdiction and scope of Southern Railway were completed by December 15, good successful time. The execution was carried retired strictly successful accordance with approved General Arrangement Drawings (GAD), Technical Approval Drawings (TAD), Railway Board instructions and applicable information and engineering provisions.

The task has already received authorisation from the competent Railway authorization with wide stipulations relating to prime assurance, drainage arrangements, structural safety, electrical information successful electrified territory and post-work certification. As per established Railway procedure, it was intelligibly conveyed that the RuB could beryllium opened for postulation connected submission of the prescribed information certificate, without requiring immoderate further inspection from Railway Headquarters.

The equilibrium works required for commissioning the RuB — attack roads, postulation integration and readiness for vehicular moveme — autumn nether the purview of the local/State authorities authorities concerned.

The Division reiterated that it is afloat supportive of the aboriginal opening of the Mahakalipadpu duplicate RuB successful the involvement of nationalist convenience and improved postulation flow.

Published - January 03, 2026 01:00 p.m. IST

Read Entire Article