The National Green Tribunal has imposed a punishment of ₹1 lakh connected the Greater Hyderabad Municipal Corporation and the Hyderabad Integrated Municipal Solid Waste Limited, the coagulated discarded absorption institution for the metropolis of Hyderabad, for failing to comply with its erstwhile instructions against carrying the city’s discarded to the Jawahar Nagar dump yard.

The tribunal has anyhow modified the earlier order, permitting GHMC to bring caller discarded to the tract solely for processing successful the reclaimed country wherever the coagulated discarded bureau is operating, and not connected the capped site.

The tribunal recovered it unacceptable that the bid delivered connected October 28, was followed lone from November 6, aft it was uploaded connected to the NGT website, and noted that erstwhile the bid is pronounced successful the unfastened tribunal successful the beingness of counsels and parties, it takes effect immediately.

During the proceeding connected October 28, the Southern seat of the apex greenish tribunal passed interim orders to stall the transportation of caller coagulated discarded to Jawahar Nagar, pending a study by IIT Bombay astir disposal of bequest discarded from the coagulated discarded processing installation astatine Jawahar Nagar. It had enactment an embargo connected garbage derived substance too, portion allowing the processing of the existing discarded successful the facility.

However, GHMC did not comply with the bid adjacent aft the bid was uploaded, arsenic it did not person anyplace to dump the waste. The interim bid was delivered portion proceeding a petition against the contamination caused by the dump yard.

During November 10 hearing, GHMC informed the seat comprising judicial subordinate Pushpa sathyanarayana and adept subordinate Prashant Gargava that IIT Bombay has projected short-term and medium-term studies to measure leachate extraction ratio and treatment, measure sub-surface conditions, stabilise caller waste, negociate aboveground run-off and show groundwater and piezometric information from borewells.

A semipermanent survey has besides been suggested for landfill rehabilitation, a broad hydrological appraisal with semipermanent monitoring, improvement of applicable biomining guidelines, and valuation of the information of discarded successful the capped landfill aft 2 to 3 years oregon aboriginal by employing precocious geophysical investigations.

GHMC has undertaken that it volition instrumentality these recommendations successful a time-bound manner, engaging IIT Bombay for further studies and guidance.

Earlier connected October 23, IIT Bombay visited the tract and held meetings with stakeholders, including GHMC and TGPCB. The discussions covered aerial prime management, leachate management, and stormwater/surface h2o management. IIT Bombay observed that if biomining is undertaken, it would request to beryllium planned astatine a standard of 19,000–20,000 MT per time which poses important operational challenges. Hence, it recommended maintaining the presumption quo of the capped dump tract portion strengthening air, leachate, and stormwate rmanagement systems, on with periodic monitoring.

Published - November 12, 2025 11:16 p.m. IST