The Greater Chennai Corporation (GCC) has planned to conception different multi-level two-wheeler parking installation adjacent the T. Nagar MLA’s office. A feasibility survey is to beryllium conducted astatine a outgo of ₹23.6 lakh for this, adjacent arsenic the existing installation remains mostly bare and underused.
The consultants to beryllium roped successful would hole a Detailed Feasibility Report successful 2 months for the projected multi-level parking-cum-commercial analyzable connected the Corporation’s onshore parcel successful the MLA bureau campus.
T. Nagar MLA J. Karunanidhi said the caller parking amenity would beryllium wrong the MLA bureau field for nationalist use.
He mentioned that the existing operation successful Pondy Bazaar was not moving optimally. He said the projected installation was meant for two-wheelers, truthful congestion caused by on-street parking connected stretches specified arsenic Ranganathan Street and smaller lanes successful T. Nagar could beryllium reduced.
On the presumption of wherefore the existent installation is not functioning well, helium said helium would cheque with the Corporation.
According to GCC, the feasibility survey volition analyse tract conditions, parking request and postulation patterns, and volition see topography surveys, ungraded investigating and appraisal of projected requirements.
It volition besides screen readying of the commercialized component, fiscal viability analysis, determining dimensions, capacity, plan parameters and improvement of a task model nether a public-private concern mode.
An enactment plan, appraisal of existing infrastructure successful T.Nagar and scope for enlargement volition beryllium done, said sources successful the civic body.

5 months ago
1



