The East-West corridor projected arsenic portion of the Musi Riverfront Development Project, volition beryllium a operation of at-grade and elevated corridors, punctuated by trumpet interchanges astatine each large junction. Its operation and operations volition beryllium successful Build-Operate-Transfer mode modelled aft the Outer Ring Road, which involves toll postulation for roadworthy use.
The details were shared though a presumption connected Friday (March 13, 2026) by the Managing Director of the Musi Riverfront Development Corporation E.V. Narasimha Reddy astatine a precocious illustration lawsuit with beingness of the Chief Minister A. Revanth Reddy attended by investors, consultants, architects, practice conservationists, biology NGOs and others wherever introduction was restricted by invitation.

3 months ago
1




