Chief Minister M.K. Stalin, connected Tuesday inaugurated done video-conference the newly-constructed roadworthy implicit span (ROB) astatine Satchiyapuram.
With this, a long-felt request of Sivakasi metropolis to flooded the postulation congestion caused by 2 railway gates -- Satchiyapuram and Tiruthangal - has been fractional fulfilled.
Later, Revenue Minister, K.K.S.S.R. Ramachandran and Finance Minister, Thangam Thennarasu, formally threw the bridge, constructed astatine a outgo of Rs. 61.74 crore, unfastened for nationalist usage.
Virudhunagar Collector, N.O. Sukhaputra, MP, B. Manickam Tagore, Sivakasi MLA, G. Ashokan, Mayor, I. Sangeetha, Sivakasi Sub-Collector, Mohammed Irfan, were among those who were present.
Speaking connected the occasion, Mr. Ramachandran said that Mr. Stalin was pursuing the footsteps of his begetter and erstwhile Chief Minister, M. Karunanidhi, who was instrumental successful operation of galore bridges during his tenure.
The Chief Minister was implementing assorted schemes that would payment the people, helium added.
Addressing the function, Mr. Thennarasu said that the operation the span enactment has been completed 3 months up giving alleviation to the radical of Sivakasi and Tiruthangal from the postulation congestion caused owed to closure of railway gross astatine Satchiyapuram.
He attributed the expedited completion of the 850-metre-long span enactment to the coordinated enactment from officials of departments similar Highways, Tangedco, people’s representatives and the contractor. “This span enactment is simply a exemplary for the inter-departmental coordination for the State successful executing specified works,” Mr. Thennarasu said.
He besides said that the enactment for the different ROB astatine Tiruthangal would soon commencement with the State Government sanctioning Rs. 74 crore, including Rs. 45 crore for the span enactment alone.
The tendering process of the enactment would commencement soon, helium added. Already, astir of the onshore acquisition enactment has been completed.
Similarly, efforts were being made to four-lane Sivakasi-Virudhunagar agelong of the road, helium added. Highways Superintending Engineer, R.K. Ramesh (Projects, Madurai), Murugesan (Construction and Maintenance, Tirunelveli), were among those who were present.

6 months ago
2







