Motorists complain of inconvenience caused by condition of Kakkan Main Road in Adambakkam

7 months ago 2
ARTICLE AD BOX

Kakkan Main Road is the main nexus roadworthy for respective residential areas of West Velachery, Adambakkam and Vanuvampet, to Anna Salai done the Race Course Road of Guindy. The motorists of West Velachery and Adambakkam beryllium connected this arterial roadworthy to scope the city. 

The agelong of the autobus way road, which was successful bully information until recently, was dug up a fewer weeks agone by Chennai Metrowater for attraction work, starring to the roadworthy becoming unmotorable. 

While the residents of Velachery person the enactment of the aged main roadworthy arsenic good arsenic the bypass roadworthy to scope Anna Salai, hundreds of motorists of westbound Velachery and Adambakkam person to usage this constrictive arterial road. With the roadworthy dug up for attraction enactment the motorists person been suffering contempt the officials of the Chennai Corporation taking up restoration of the road. 

R. Amaresh, a nonmigratory of AGS Colony successful West Velachery, said the mediate of the roadworthy has been dug up and motorists are facing terrible inconvenience navigating the stretch, arsenic the roadworthy is besides utilized by Metropolitan Transport Corporation buses. He wanted the Corporation officials to spot up the roadworthy astatine the earliest. 

Residents and motorists of the locality rued that the Corporation officials could person postponed support for digging up the roadworthy by a fewer months, knowing good that the northeast monsoon is imminent. The road, being located adjacent to the Velachery Lake, usually gets flooded during dense rains. 

The roadworthy has been dug up for underground drainage main pipeline work, and support was already sought for this, said a section authoritative of GCC. “If the pipeline is near unrepaired, that volition besides origin issues for the radical surviving connected the agelong and nearby. So the roadworthy was chopped open, and enactment was started. It volition beryllium done successful the adjacent fewer days and volition beryllium patched up with cement concrete,” helium added.

However, since rains person already started, residents are not hopeful of an aboriginal resolution.

Published - October 22, 2025 05:30 americium IST

Read Entire Article