The Road Over Bridge (ROB) connected the Secunderabad–Falaknuma–Shivarampally Railway Line, connecting Mailardevpally to the Falaknuma RTC Depot via Shastripuram, was inaugurated connected Friday (April 17, 2026) by IT & Industries Minister, D. Sridhar Babu.
The 4-lane ROB , with a magnitude of 490 m and width of 16.6 m (railway span: 37.28 m), was constructed nether EPC mode astatine a outgo of ₹71 crore, arsenic per a connection from Greater Hyderabad Municipal Corporation (GHMC). The operation is equipped with alloy girders, RCC precast elements, POT-PTFE bearings, and modular enlargement joints, ensuring enhanced safety, durability, and businesslike postulation movement, it said.

1 month ago
1








