The Metro bid services connected the Yellow Line of Bengaluru Metro were disrupted for astir 3 hours connected Sunday greeting owed to a method glitch successful 1 of the trains, the Bangalore Metro Rail Corporation Limited (BMRCL) said successful a statement.
The contented occurred astir 10.15 a.m., resulting successful trains operating astatine a reduced frequence of 25 minutes. “Due to a method glitch successful a train, trains were moving with a hold connected the Yellow Line from 10.15 a.m. with a headway of 25 minutes. Public are requested to enactment and cooperate please,” a BMRCL connection said.
The BMRCL aboriginal said that mean operations were restored astatine 1.58 p.m., astir 3 hours aft the contented was archetypal reported.

7 months ago
2



