Metro Rail continues to wait for approval from Railway Board

6 months ago 1
ARTICLE AD BOX
The CMRL volition  besides  request   support  from Research Designs and Standards Organisation and the Commissioner of Railway Safety.

The CMRL volition besides request support from Research Designs and Standards Organisation and the Commissioner of Railway Safety. | Photo Credit: FILE PHOTO

Three months aft the inspection of a conception of the signifier II task was completed, the Chennai Metro Rail is yet to person a fewer mandatory approvals from the Research Designs and Standards Organisation (RDSO) and the Railway Board, Ministry of Railways.

The Chennai Metro Rail Limited (CMRL) has raised the contented with the Ministry of Housing and Urban Affairs and the Project Monitoring Group of the Union government. This radical was formed to code the bottlenecks successful large-scale infrastructure projects successful the country.

Approvals from the RDSO and the Board are a prerequisite for a fewer aspects, including train, signalling and telecom, track, and traction.

They are indispensable for the Chennai Metro Rail to commencement bid operations betwixt Poonamallee and Porur, a portion of signifier II project’s corridor 4.

In August, a squad of officials from the RDSO conducted extended testing, checking assorted parameters indispensable for harmless operations on the Poonamallee-Porur stretch.

According to CMRL officials, based connected the testing, the RDSO indispensable o.k. the velocity astatine which trains tin beryllium operated successful the signifier II project. The Railway Board has granted support for the track, civil, and traction system. “But they are yet to contented the RDSO velocity certificateand assistance support for the signalling and telecom system,” an authoritative said.

The officials said specified approvals were usually granted wrong 15 days or, astatine most, a month. “It is antithetic that immoderate of the approvals person not yet been given. We were asked immoderate queries aft the investigating and inspections, but we person already answered them. It is not wide wherefore approvals person not yet been granted. One of the elder officials [from CMRL] volition person a gathering with the railway officials, aft which we volition cognize if they request further accusation oregon if determination is immoderate issue,” different authoritative said.

Apart from these approvals, the Commissioner of Railway Safety volition besides request to springiness last support earlier the agelong tin beryllium opened for rider operations. The CMRL is apt to invitation them for inspection aft the presumption operation enactment is completed.

Published - November 22, 2025 12:14 americium IST

Read Entire Article