Messi’s Kochi visit in March faces fresh doubts as no official announcement yet on Argentina friendly match

4 months ago 2
ARTICLE AD BOX
Lionel Messi

Lionel Messi | Photo Credit: Reuters

Uncertainty continues to loom implicit the sojourn of the World Cup-winning Argentina team, led by Lionel Messi, for an planetary affable lucifer successful Kochi, Kerala.

The event’s sponsor, Reporter Broadcasting Corporation (RBC), remains incapable to warrant that the squad volition get during the March model arsenic publicised, aft the primitively scheduled sojourn connected November 25 was called off.

The Greater Cochin Development Authority (GCDA), which faced overmuch flak for allotting the Jawaharlal Nehru International Stadium nether its ownership to a backstage enactment for hosting the game, allegedly without pursuing owed process, besides has nary clarity connected whether the much-hyped sojourn volition materialise. GCDA sources stated that they could neither corroborate the sojourn nor contradict that it volition not instrumentality place, arsenic RBC appears to inactive beryllium successful consultation with the Argentina Football Association (AFA).

“We are not successful a presumption to officially corroborate the visit, though we person an statement successful spot with the AFA for the team’s arrival. However, the day keeps shifting – primitively from October to November, and present to March. We person been informed that an announcement whitethorn beryllium made by January 31 successful effect to a message we sent a fewer days ago,” said Anto Augustine, managing manager of RBC.

After the archetypal affable lucifer betwixt Argentina and Australia, scheduled for November 25, was called disconnected successful October, RBC handed implicit the stadium to GCDA connected November 28. However, the sponsor claimed that renovation works continued until December 20, the primitively agreed day for returning the stadium.

“Renovation works person been completed but for resurfacing the parking batch and finishing a abbreviated agelong of the compound wall. Floodlights volition beryllium upgraded with caller LED fittings, which the sponsors person already procured, depending connected whether the sojourn takes place. The dressing rooms, players’ area, toilets, and playing turf person each been upgraded to planetary standards,” said GCDA sources.

Mr. Augustine explained that the 2 pending works were delayed owed to ineligible hurdles, though lone a precise abbreviated information of the compound partition remains unfinished. He added that works worthy astir ₹40 crore person been carried retired astatine the stadium. GCDA, however, said that the renovations are being assessed by an adept squad comprising members of the bureau and the Sports Kerala Foundation, a non-profit institution nether the Department of Sports and Youth Affairs, which served arsenic the peculiar intent conveyance for the full event.

Published - January 22, 2026 01:28 p.m. IST

Read Entire Article