Madras High Court admits PIL challenging G.O. on pedestrian crossings on Avinashi Road in Coimbatore city

3 days ago 2
ARTICLE AD BOX
The Madras High Court has admitted a PIL challenging a Government bid   that has deleted allocation of funds for pedestrian crossings arsenic  a portion  of the Avinashi Road flyover task  successful  Coimbatore city.

The Madras High Court has admitted a PIL challenging a Government bid that has deleted allocation of funds for pedestrian crossings arsenic a portion of the Avinashi Road flyover task successful Coimbatore city. | Photo Credit: SIVA SARAVANAN S

The Madras High Court has admitted a nationalist involvement litigation (PIL) challenging a authorities bid (G.O.) that has withdrawn ₹15.47 crore allocated for instauration of pedestrian crossings arsenic portion of the Avinashi Road flyover (G.D. Naidu flyover) successful Coimbatore city.

K. Kathirmathiyon, caput of the Coimbatore Consumer Cause, said successful a property merchandise that the First Bench of the Madras High Court admitted the PIL filed by the user assemblage challenging a G.O. dated July 11, 2024, wherever the estimation for the Avinashi Road flyover was revised, deleting the pedestrian subway facilities that were primitively approved for the project.

The Bench has directed the Tamil Nadu authorities to record its reply and has posted the substance for further proceeding connected June 30.

The PIL seeks restoration of the archetypal approved program and operation of pedestrian subways astatine the 5 identified locations - adjacent KMCH Hospital, GRG School, PSG College, Krishnammal College and Lakshmi Mills Junction successful Coimbatore city.

The archetypal connection that was sanctioned successful 2020 astatine a outgo of ₹1,621.30 crore included 5 pedestrian subways with an allocation of ₹15.47 crore exclusively for pedestrian safety. The connection was approved by the Technical Audit Committee.

The Highways Department had projected earlier the District Road Safety Committee that each 5 subways beryllium deleted connected the crushed that the projected Metro Rail task volition see pedestrian facilities and that pelican signals volition beryllium capable connected the work roads of the 10-km flyover.

This connection was opposed by Mr. Kathirmathiyon, who is simply a subordinate of the District Road Safety Committee too. He pointed retired that the archetypal task had recognised the necessity for grade-separated pedestrian crossings arsenic Coimbatore recorded precocious fig of pedestrian fatalities owed to inadequate crossing facilities.

The District Collector past called for a Special Road Safety Committee Meeting, attended by the Police Commissioner and the Corporation Commissioner excessively to sermon the contented and it directed that facilities should beryllium created to guarantee pedestrian information and the crossings should beryllium developed without deviations.

However, accusation obtained nether the Right to Information Act subsequently revealed that the 5 subways were deleted from the revised estimation and that the full ₹15.47 crore earmarked for pedestrian information had been removed. At respective locations, adjacent the postulation signals were replaced with U-turns, making it highly hard for students, patients, elder citizens and children to transverse the roadworthy safely.

Published - June 16, 2026 08:21 p.m. IST

Read Entire Article