L&T bags order related to Hyderabad Greenfield Radial Road

5 months ago 1
ARTICLE AD BOX
As portion  of Phase-2 of the Greenfield Radial Road, a 22.3 km 3+3 lane access-controlled radial roadworthy  is being constructed successful  Ranga Reddy territory  of Telangana. The representation  is utilized  for typical  purposes only.

As portion of Phase-2 of the Greenfield Radial Road, a 22.3 km 3+3 lane access-controlled radial roadworthy is being constructed successful Ranga Reddy territory of Telangana. The representation is utilized for typical purposes only. | Photo Credit: NAGARA GOPAL

Infrastructure large Larsen & Toubro (L&T) has bagged an bid pertaining to the Phase-2 of the Hyderabad Greenfield Radial Road.

The scope of enactment involves operation of a 3.6 km agelong viaduct, insignificant bridges, underpasses and culverts. Construction of work roads connected some sides, extended retention structures, stormwater drainage system, footpaths, rhythm way and landscaping works is besides successful L&T’s scope, the institution said connected Monday (December 29, 2025).

The bid pertains to Phase-2 of the Greenfield Radial Road, arsenic portion of which a 22.3 km 3+3 lane access-controlled radial roadworthy is being constructed successful Ranga Reddy territory of Telangana. This is the archetypal of respective planned radial roads linking Hyderabad’s Outer Ring Road (ORR) to the upcoming Regional Ring Road. It volition amended determination connectivity and enactment growth, providing amended entree to IT hubs, Electronic City, the Young India Skills University and the Bharat Future City, (L&T)) said.

Announcing that its proscription infrastructure concern vertical has won the order, L&T said it is simply a important order—as per the company’s classification of projects which autumn successful the scope of ₹1,000 to 2,500 crore.

Published - December 29, 2025 02:44 p.m. IST

Read Entire Article