The near and the close canals of the KRP dam were opened for irrigation connected Friday. The h2o volition irrigate 9,012 acres dispersed crossed 16 villages.
The quantum of h2o merchandise entails 75 cubft done the Right Main Canal and 76 cuft done the Left Main Canal with a cumulative 151 cub.ft projected to beryllium released.
The villages of Periyamuthur, Sundekuppam. Thimmapuram, Souttahalli, Thallihalli, Kalveyhalli, Kundalpatti, Mittahalli, Errahalli, Penneswaramadam, Kaveripattinam, Balekulli, Marisettihalli, Nagojanahalli, Janaparahalli, and Payyur among 16 villages slated to payment from the waters of KRP dam.
The reservoir’s capableness was 1184.59 cb.ft (47.45ft); inflow into the reservoir was 174 cub.ft, and the inflow done the sluiceway was 12 cubft. Earlier, Collector C.Dinesh Kumar opened the canal’s shutters for irrigation.
Barur lake
Water was released from Barur water with the opening of the East Main Canal and the West Main Canal successful Pochampalli connected Friday. The h2o from the 2 main canals volition irrigate implicit 2,397.42 acres crossed 7 villages. This entails 1583.75 acres irrigated done the waters of the East Main Canal and 813.67 acres done the waters of the West Main Canal.
Taking into relationship the existent h2o level successful the lake, the h2o level successful the canals and successful anticipation of rains, 50 cu.ft of h2o volition beryllium released done the East Main Canal and 20 cu.ft volition beryllium released done the Left Main Canal for 5 days for raising of nurseries. Thereafter, h2o volition beryllium released connected crook strategy for 3 days and shutters closed for 4 days alternatively.
The h2o of Barur water volition assistance irrigate 7 villages including Kottapatti, Barur, Pendarahalli, Arasampatti, Keezhkuppam, Jingalkadirampatti, Thadampatti. The h2o volition beryllium released for 120 days up to May 8, 2026.

4 months ago
1


