Kerala’s Technopark invites EoI from co-developers for QUAD project at Technocity

5 months ago 1
ARTICLE AD BOX

Technopark has invited Expressions of Interest (EoI) from reputed backstage existent property developers to spouse arsenic co-developers for the operation and cognition of an IT gathering and commercialized analyzable nether the flagship QUAD task astatine Technocity. Located adjacent Pallippuram, Technocity is Phase IV of the Technopark.

Envisaged arsenic a 30-acre non-SEZ integrated IT micro-township, QUAD is simply a marquee improvement comprising 2 IT towers, a commercialized complex, and a residential component, an authoritative connection said present connected Saturday (December 27, 2025).

The existent EoI pertains to the 2nd IT gathering and the commercialized complex. The IT gathering volition beryllium developed connected 4.5 acres with a built-up country of astir 8,00,000 sq ft, scalable up to 1.35 cardinal sq ft with FAR 7 (Floor Area Ratio).

The commercialized analyzable volition span 5.6 acres, offering astir 9,00,000 sq ft of space, scalable up to 1.7 cardinal sq ft with FAR 7, it said.

The 2nd IT gathering volition beryllium leased connected a semipermanent basis, providing co-developers the accidental to pull reputed IT/ITeS companies and run from a high-demand destination, the connection said.

With astir 125 companies presently successful the queue for IT space, QUAD offers a compelling proposition to spouse with Technopark, 1 of the largest and greenest IT parks successful the country, backed by the Kerala government.

This concern presents a unsocial accidental to collaborate with the authorities successful processing next-generation integer infrastructure successful Thiruvananthapuram.

With implicit 500 companies, a workforce of much than 80,000 professionals, 12.72 cardinal sq ft of built-up IT space, and a accordant CRISIL A+/Stable rating, the Technopark stands arsenic a mature, trusted, and future-ready IT destination.

A pre-bid gathering to little funny developers connected the EoI details volition beryllium held astatine 4 p.m. connected December 30, some online and offline. The day for the EoI presumption is January 5, 2026, the connection added.

Published - December 27, 2025 06:21 p.m. IST

Read Entire Article