Kerala HC extends suspension of toll collection at Paliyekkara till September 30

8 months ago 4
ARTICLE AD BOX

The Kerala High Court connected Thursday extended till September 30 its interim bid suspending toll postulation astatine the National Highways Authority of India’s (NHAI) Paliyekkara toll plaza successful Thrissur. This followed a submission by the Thrissur District Collector, who heads the interim postulation absorption committee and appeared online earlier the court, that dense postulation congestion persisted inactive astatine galore places successful the 65-km Edappally-Mannuthy NH 544 corridor. There were besides information issues successful the signifier of inadequately barricaded worksites. He said the NHAI had not afloat complied with the directions issued, arsenic directed by the court, to guarantee harmless and creaseless postulation flow. The postulation absorption committee underscored the request for contiguous and sustained protective measures specified arsenic “effective autumn extortion systems, due drainage management, shoring of excavation cuttings, capable lighting, and proviso of high-quality information installations. Such interventions are captious for preventing further roadworthy borderline collapses and to guarantee the harmless question of traffic.”

The committee besides emphasised that lone the expeditious completion of the underpass operation works tin guarantee a sustainable and lasting solution to postulation absorption issues successful these captious stretches, pursuing which the tribunal extended the suspension of the toll postulation till September 30.

The tribunal was proceeding petitions by, among others, Thrissur autochthonal Shaji J. Kodankandath connected the information of the NH corridor, its work roads and consequent postulation hold-ups.

Published - September 25, 2025 09:28 p.m. IST

Read Entire Article