Kerala govt. insisting on SilverLine as standalone project, says railway ministry

3 months ago 1
ARTICLE AD BOX

The Ministry of Railways connected Friday said the Kerala authorities was insisting connected treating the SilverLine task arsenic a standalone venture, contempt being asked to revise its elaborate task study (DPR) to integrate it with the existing network.

According to a property release, the Kerala authorities is moving connected the semi-high-speed line, named SilverLine, and has prepared its DPR. The DPR was prepared by the Kerala Rail Development Corporation Ltd. (KRDCL), a associated task of the Government of Kerala and the Ministry of Railways, it said.

The Railway Ministry had advised the KRDCL to revise the DPR successful enactment with the latest method standards, including the adoption of wide gauge for integration with the railway network, a flatter ruling gradient, a due drainage strategy for yards and sections, and biology safeguards during construction, cognition and integration with the existing network. “However, the Government of Kerala is insisting connected considering the SilverLine task arsenic a standalone project,” the merchandise added.

530-km railway line

The accusation was provided by Union Railway Minister Ashwini Vaishnaw successful reply to questions successful the Rajya Sabha, it said. The projected 530-km railway line, to beryllium developed by K-Rail, a associated task betwixt the Kerala authorities and the Ministry of Railways, has been stalled owed to wide nationalist protests, absorption from governmental parties and delays successful securing Central authorities approvals.

SilverLine aims to trim obstruction question clip betwixt Thiruvananthapuram and Kasaragod to 4 hours.

Published - February 13, 2026 08:26 p.m. IST

Read Entire Article