KBR Park one-way trial run aimed at long-term solution for traffic bottlenecks in the area, says Hyderabad Police Commissioner Sajjanar

2 weeks ago 1
ARTICLE AD BOX

The Hyderabad Traffic Police connected Sunday carried retired the 2nd one-way postulation proceedings tally astir KBR Park arsenic portion of the efforts to measure aboriginal postulation absorption measures linked to the ongoing Hyderabad City Innovative & Transformative Infrastructure (H-CITI) project.

Hyderabad Police Commissioner V.C. Sajjanar conducted a tract inspection of the proceedings tally and reviewed postulation question astatine cardinal junctions astir KBR Park, wherever large infrastructure works, including alloy flyovers and underpasses, are nether construction.

Accompanied by Joint Commissioner of Police (Traffic), D. Joel Davis, DCP Kajal, Jubilee Hills DCP A. Ramana Reddy and different elder officials, the Commissioner inspected the agelong from the KBR Park main gross done Basavatarakam Hospital, Agrasen Junction, Film Nagar, Road No. 45 and Jubilee Hills Check Post.

Officials said the workout was aimed astatine studying whether a modified postulation circulation strategy could assistance code congestion successful 1 of the city’s busiest corridors, which is expected to witnesser a important summation successful postulation volumes successful the coming years.

Speaking during the inspection, Mr. Sajjanar said the proceedings was designed to place a semipermanent solution for postulation bottlenecks successful the KBR Park area. He noted that the archetypal proceedings tally was conducted connected April 5 and that lessons learned from that workout had been incorporated into Sunday’s operation.

The Commissioner said mean postulation question would resume from Monday and that the one-way statement was lone a impermanent workout intended to stitchery field-level data. Authorities are presently studying the difficulties faced by motorists and identifying locations wherever congestion persists contempt the modified postulation pattern.

The Commissioner said abrupt lane changes by motorists had emerged arsenic 1 of the large challenges during the proceedings and appealed to commuters to travel postulation signboards and constabulary instructions.

Joint Commissioner D. Joel Davis said postulation engineers observed challenges astatine lane-merging points and intersections wherever vehicles switched directions. To amended conveyance movement, constabulary are readying a dedicated 150-metre interchange portion betwixt Jubilee Hills Check Post and KBR Park to facilitate safer and smoother lane merging.

Officials are besides examining the feasibility of installing pedestrian signals astatine KBR Park and Jubilee Hills Check Post. Traffic travel during the proceedings was monitored utilizing drone surveillance, with information being collected for further analysis.

Published - June 21, 2026 06:50 p.m. IST

Read Entire Article