HYDRAA probes ‘encroachment’ of Musi by real estate project developer 

7 months ago 2
ARTICLE AD BOX

The Hyderabad Disaster Response and Asset Protection Agency (HYDRAA) has begun probe into the allegations of encroachment by a well-known existent property developer onto the Musi stream astatine Manchirevula village, by the Narisingi exit of the Outer Ring Road. Also coming into question is the erasure of a earthy people of h2o emptying into the stream astatine the location.

A squad from HYDRAA visited the operation tract of the luxury flat analyzable connected Tuesday, to ascertain the nonstop determination of the task vis-a-vis the Maximum Flood Level (MFL) of the river.

While allegations of encroachment person been levelled ever since the task was started, nary of the authorities acrophobic person ever confirmed the same. It is reported that the task was accorded support by the Hyderabad Metropolitan Development Authority, which was aboriginal cancelled, prompting the builder to attack the High Court and get a favourable bid for the construction.

When questioned astir the alleged infringement during a media league previously, HMDA Commissioner Sarfaraz Ahmed replied that the builder was utilizing the buffer portion of the stream to presumption his equipment, which was not against the rules arsenic it was a backstage land.

However, during the caller dense rains, erstwhile 35,000 cusecs of surplus h2o was released from the duplicate reservoirs into the Musi river, the cellars nether operation astatine the tract were reportedly submerged, which re-ignited the allegations astir the encroachment.

HYDRAA main A.V. Ranganath confirmed the same.

“Drone images were captured wherein it tin beryllium seen that the stream h2o entered the cellars of the structures. Prima facie, determination seems to beryllium valid crushed for the allegations, which is wherefore we are investigating into the matter,” Mr. Ranganath said.

In 1908, erstwhile Musi stream experienced the astir devastating floods, the travel was recorded arsenic 4.5 lakh cusecs. Following the floods, the duplicate reservoirs of Osmansagar and Himayatsagar were constructed to incorporate the travel successful lawsuit of floods. Irrigation experts accidental that the stream could easy transportation 60,000 cusecs of h2o wrong its MFL.

Asked if determination was immoderate breach of the river’s MFL arsenic demarcated by the Irrigation section officials, Mr. Ranganath said determination were suspicions astir the bound being compromised to accommodate the project. One much facet of enquiry is astir erasure of a earthy h2o transmission which flowed into the stream done the task site.

A hunt of the Google humanities outer images intelligibly shows the h2o transmission flowing done the tract to merge with the river. An representation arsenic caller arsenic November, 2022 intelligibly shows the river’s travel arsenic good arsenic the transmission emptying into the river, portion the transmission disappears successful the latest image, and the country of the river’s travel being filled up and levelled by the project.

Published - October 15, 2025 12:28 americium IST

Read Entire Article