Hennur-Bagalur white-topping work to be completed by Oct.-end

8 months ago 2
ARTICLE AD BOX

The Hennur-Bagalur main roadworthy white-topping task is slated for completion by the extremity of October, East Corporation Commissioner D.S. Ramesh, said aft reviewing ongoing roadworthy works connected Monday. He directed that each pending operation including carriageways, footpaths, inferior ducts and electrical poles indispensable beryllium completed connected clip and opened for postulation without delay. The white-topping enactment covers a region of a 5 km agelong from Geddalahalli Railway Line to Farhan College.

Mr. Ramesh besides directed that each potholes indispensable beryllium filled wrong 2 days, and the Executive Engineer is required to taxable a compliance certificate confirming remedial measures. The commissioner besides instructed that completed roads indispensable not beryllium dug up without anterior support and outgo of restoration charges.  

Commissioner inspects connected motorcycle

Central Corporation Commissioner Rajendra Cholan inspected roads wrong the Chickpet ward limits connected a bike. He reviewed ongoing pothole repair work, wide roadworthy information and garbage disposal successful the area.  

Published - September 29, 2025 08:40 p.m. IST

Read Entire Article