Early morning rain disrupts life in Hyderabad on September 26; Cyberabad traffic police issue work-from-home advisory

8 months ago 3
ARTICLE AD BOX
Cyberabad Police issued Work from Home advisory for offices successful  the commissionerate limits for September 26, 2025

Cyberabad Police issued Work from Home advisory for offices successful the commissionerate limits for September 26, 2025 | Photo Credit: BY ARRANGEMENT

Heavy rainfall successful Hyderabad flooded low-lying areas disrupting postulation flow. Water logging was reported successful Begumpet, Maitrivanam and different parts of the city. In Miyapur, pipeline roadworthy adjacent the MHM railway nether span was closed owed to inundation. At Katedan, the Old Kurnool roadworthy railway underpass was flooded, with teams clearing clogged drains to reconstruct flow.

Police and Hyderabad Disaster Response and Asset Protection Agency (HYDRAA) teams deployed with dewatering pumps to velocity up clearance astatine captious points.

The Cyberabad postulation constabulary issued an advisory urging IT companies to let employees to enactment from location connected Friday (September 26, 2025) successful presumption of dense rains that lashed the metropolis overnight and are forecast to proceed done the day. The determination is to guarantee safety, productivity and uninterrupted exigency services and debar postulation congestion.

Officials said persistent mean to dense spells are expected, with intermittent breaks, and the upwind volition stay overcast and gloomy.

A yellowish alert is successful spot crossed the Cyberabad portion for astir of the time and night, with periods of orangish alert anticipated during the greeting and nighttime hours. Rains are expected to screen astir each areas of Cyberabad, raising the likelihood of waterlogging and dilatory postulation movement.

Traffic constabulary person already reported respective stretches affected by flooding. These see the agelong from the HCU depot adjacent the University of Hyderabad towards Masjid Banda, Kothur underpass, connected Prism Road successful Gowlidoddi and astatine the commencement of the Shaikpet flyover.

Police person advised commuters to thrust cautiously and expect delays successful affected areas until the concern improves. The postulation power country is intimately monitoring developments and Disaster Response Force teams stay connected standby, the advisory said.

Published - September 26, 2025 10:26 americium IST

Read Entire Article