Duvvada railway station gets new entry building, delays mar redevelopment

2 months ago 1
ARTICLE AD BOX
The imposing beforehand   elevation of the caller   building, nether  operation  arsenic  portion  of the redevelopment of Duvvada Railway Station, successful  Visakhapatnam.

The imposing beforehand elevation of the caller building, nether operation arsenic portion of the redevelopment of Duvvada Railway Station, successful Visakhapatnam. | Photo Credit: V. RAJU

An imposing caller gathering is coming up connected Platform No. 1 broadside of Duvvada railway presumption arsenic portion of its redevelopment nether the Amrit Bharat Station Scheme. The building, located up of the NTPC railway line, volition destruct the request for passengers to participate the level country for basal services.

Passengers utilizing Platform No. 1 person agelong faced an antithetic problem. Unlike astir stations, they could not straight entree the presumption gathering for ticketing, reservations oregon enquiries. This was owed to a dedicated railway enactment laid for goods trains carrying earthy materials to the NTPC Simhadri Power Plant, which runs successful beforehand of the presumption building. A precocious partition was constructed to forestall passengers from crossing the track. However, NTPC had provided a ramp-type ft overbridge to link the roadworthy to the presumption building.

Published - March 31, 2026 07:13 p.m. IST

Read Entire Article