CPI(M) stages protest demanding widening of Kamarajar Road in Coimbatore

8 months ago 3
ARTICLE AD BOX
Communist Party of India (Marxist) staging a protestation  adjacent   Singanallur connected  Monday demanding widening of Kamarajar Road.

Communist Party of India (Marxist) staging a protestation adjacent Singanallur connected Monday demanding widening of Kamarajar Road. | Photo Credit: SPECIAL ARRANGEMENT

The Communist Party of India (Marxist) connected Monday staged a protestation demanding widening and contiguous repair of Kamarajar Road, which links Avinashi Road and Tiruchi Road successful Coimbatore.

Members attached to Peelamedu and Singanallur municipality branches of CPI (M) staged the protestation astatine Singanallur Karumbukadai maidanam.

“This a precise important roadworthy that connects Singanallur connected Tiruchi Road with Hope College connected Avinashi Road. The contiguous information of the roadworthy is posing menace to motorists arsenic the cuts formed aft laying pipeline person not been levelled fully. Several accidents, including a fatal 1 that killed an inspector, happened owed to the pathetic information of the road. The repair works person to beryllium completed astatine the earliest to prevention lives,” said R. Moorthi, Singanallur municipality caput of CPI (M), who headed the protest.

He said Kamarajar Road needs to beryllium widened considering the summation successful the colonisation and vehicular traffic. It is said that the roadworthy utilized to beryllium 60-80 feet wide decades ago, helium said.

The party’s territory enforcement committee members K. Manoharan, K. Ajaykumar, V. Theivendran, territory committee subordinate K. Pandiyan, C. Jothimani, Peelamedu municipality caput A. Meganathan, councillor of ward 24 R. Boopathi were contiguous astatine the protest.

Published - September 29, 2025 06:43 p.m. IST

Read Entire Article