‘Complete Lambasingi Freedom Fighters Museum within three months’

8 months ago 3
ARTICLE AD BOX

Project Officer of Integrated Tribal Development Agency (ITDA), Paderu, T. Sri Pooja, has directed officials to implicit the operation works of the Freedom Fighters Museum astatine Lambasingi wrong 3 months. She inspected the ongoing works of the museum, being built astatine a outgo of ₹35 crore, successful Alluri Sitharama Raju territory connected Monday.

Speaking to officials, the PO emphasised that portion attracting tourist, the depository should bespeak tribal civilization and traditions. She instructed officials to support strict prime standards successful the operation works. She besides assured that the onshore quality volition beryllium resolved aft discussions with farmers.

The PO inspected the impermanent location being constructed by ITDA astatine Lambasingi and said that the installation should beryllium disposable to tourists during the existent season. She visited Chintapalli java pulping unit, and interacted with members and enquired astir their issues.

ITDA Assistant Project Officer M. Venkateswara Rao, Tribal Welfare Department Executive Engineer G. David Raju, and others were present.

Published - September 22, 2025 08:30 p.m. IST

Read Entire Article