Coimbatore Corporation begins works to commission multi-level car parking at R.S. Puram

6 months ago 2
ARTICLE AD BOX
Cars parked wrong  the multi-level car   parking installation  astatine  R.S. Puram successful  Coimbatore city.

Cars parked wrong the multi-level car parking installation astatine R.S. Puram successful Coimbatore city. | Photo Credit: M. PERIASAMY

The Coimbatore Corporation has taken up repair works to committee a multi-level car parking installation connected DB Road successful R.S. Puram.

The installation constructed by the Corporation is simply a ground-plus four-storeyed operation connected 2.87 acres and tin accommodate 373 cars. It was taken up nether the Smart Cities Mission astatine astir ₹40.78 crore and completed successful June 2022.

However, commissioning was delayed arsenic the civic assemblage awaited energy connection, which required a completion certificate from the Local Planning Authority. When tenders were invited for cognition and attraction aft completing the procedures, nary steadfast came forward.

As the installation remains unused, the mechanical components, including the assistance and shuttle systems, became inoperative. “We had to transportation retired repair works, including replacement of spares, greasing, and strategy checks. The archetypal and 2nd floors are operational allowing parking for astir 160 cars. Works connected the 3rd and 4th floors are expected to beryllium completed successful 2 months,” an authoritative said.

The Corporation has started allowing vehicles to beryllium parked connected the archetypal and 2nd floors utilizing the assistance system. “At present, astir 130 cars are parked connected the crushed floor, including those occupying the unfastened country wrong the premises. Vehicle owners person been informed that the installation is being brought into operation,” the authoritative said.

The installation is designed arsenic a afloat automated parking structure, with assistance strategy for vertical question of vehicles and trolleys for horizontal transportation to parking slots. The mean parking oregon retrieval clip for vehicles from the archetypal and 2nd floors is astir 60 seconds, and for the precocious floors astir 90 seconds.

“There is nary alteration successful charges arsenic the monthly complaint is fixed astatine ₹3,540. The ticketing antagonistic and restrooms are besides repaired. The unfastened country successful the installation is being paved and whitethorn beryllium utilized for either car oregon two-wheeler parking. An EV charging presumption is besides planned,” the authoritative added.

The Corporation proposes to make a nutrient tribunal wrong the premises nether the public-private concern mode astatine ₹6 crore. The connection has been sent to the Directorate of Municipal Administration for approval.

Published - November 09, 2025 06:50 p.m. IST

Read Entire Article