Chennai desperately needs the projected eco-park and aggregate ponds connected the sprawling 160.86 acre authorities property, that had been leased retired to Madras Race Club (MRC) during the British era, astatine Guindy to forestall catastrophes specified arsenic the monolithic harm caused to the metropolis during the 2015 floods, the Madras High Court has said.
A Division Bench of Justices S.M. Subramaniam and Mohammed Shaffiq wrote: “Eco parkland is intended to service aggregate purposes. Firstly, it is intended to mitigate the hazard of flooding, which the metropolis progressively faces with each passing monsoon. Secondly, it is indispensable to reiterate the sedate concerns surrounding aerial contamination and Air Quality Index (AQI) levels, simplification of which forms a cardinal portion of the rationale down the eco park.”
Stating aerial contamination was not simply an biology contented anymore, the judges agreed with elder counsel P. Wilson, representing Tamil Nadu government, that it had go a nationalist wellness emergency. “The acquisition of the citizens of Delhi successful the caller past is simply a stark reminder, wherever escalating AQI levels person led to lockdowns, closure of schools, disruption of nationalist life, and terrible wellness impacts,” the Bench said.
Allowing a State entreaty against a presumption quo bid passed by a azygous justice successful favour of MRC, the Division Bench said, the constitution of the eco-park connected the Guindy spot would besides beforehand tourism and service arsenic a earthy situation to respective taxon of flora and fauna. The Bench agreed with the State that the eco-park and ponds had been conceived successful nationalist involvement and therefore, the presumption quo bid could not basal successful the way.
Authoring the verdict, Justice Shaffiq pointed retired that a study titled ‘Chennai Floods 2015 – A Rapid Assessment,’ prepared by the Interdisciplinary Centre for Water Research, Indian Institute of Science (IISc) successful Bengaluru successful May 2016, had highlighted the adverse interaction of rains and consequential harm caused by the 2015 floods owed to mushrooming constructions connected marshlands/wetlands successful Chennai.
The study sated the ample standard devastation crossed Chennai, Kancheepuram and Tiruvallur districts had claimed much than 400 lives successful November-December 2015. Over 4 cardinal radical were affected owed to the floods and astir 1.8 cardinal were displaced. Around 1.7 cardinal had to beryllium accommodated successful 6,605 alleviation camps and the estimated economical nonaccomplishment was astir $3 billion.
More than 3.042 cardinal families suffered harm to their dwellings and astir 30% of Chennai households incurred idiosyncratic losses ranging betwixt ₹2 lakh and ₹20 lakh. “The study further records that concern and commercialized operations came to a standstill with the Chennai airdrome remaining closed betwixt December 1 and 6 and losses arising solely from halted concern accumulation was astir ₹15,000 crore.” the Bench said.
The judges recorded the submissions of Mr. Wilson that the 4 ponds that person already been dug connected the Guindy spot would mitigate adverse interaction of floods successful aboriginal successful Velachery, Adambakkam, Madipakkam, Guindy, Pallikaranai and different adjoining areas successful the city. Further, the projected eco-park connected 118-acres would supply the overmuch required lung space.
“The supra submissions connected the nonsubjective down improvement of ponds and eco parkland arsenic portion of flood mitigation measures to alleviate the adverse interaction of floods would service and beforehand larger nationalist interest. This underscores prima facie the request to guarantee that the supra works are not hindered successful immoderate manner, moreso by judicial orders,” the Division Bench said and modified the bid of presumption quo.

7 months ago
1




