Channels at Chennai Port to be deepened for handling larger vessels

7 months ago 2
ARTICLE AD BOX
The enactment    volition  beryllium  carried retired  to summation   the diameter of the turning ellipse  astatine  some  the Bharathi and Ambedkar Docks.

The enactment volition beryllium carried retired to summation the diameter of the turning ellipse astatine some the Bharathi and Ambedkar Docks. | Photo Credit: B. JOTHI RAMALINGAM

For berthing and harmless manoeuvring of precise ample crude carriers, Chennai Port Authority volition soon transportation retired superior dredging work. This infrastructure upgrade is simply a necessity to grip ample vessels with a magnitude of 350 m oregon more.

The superior dredging enactment (deepening of the existing channels to cater to ample vessels) volition beryllium done to summation the diameter of the turning ellipse astatine some the Bharathi and Ambedkar Docks.

While the Ambedkar Dock turning circle’s diameter of 392 m volition summation by 200 m, the Bharathi Dock’s 560-m turning ellipse volition beryllium expanded by 50 m. The completion of the enactment volition alteration the turning of ample instrumentality and crude vessels astatine the port.

According to Chennai Port Authority, the superior dredging task is important for the port’s maturation arsenic it volition assistance larger, deeper vessels, and precise ample crude carriers to safely entree the facility. At times of adverse upwind conditions, portion deepening the channels substantially decreases the hazard of vessels moving aground, widening the channels volition assistance vessels manoeuvre safely and let for two-way traffic.

Set for upgrade

Dredging is carried retired astatine harbours chiefly to support and heighten navigation infrastructure

Capital dredging is carried retired to deepen existing channels oregon found caller ones to facilitate the holding of ample vessels

This volition assistance with the harmless manoeuvring of precise ample instrumentality and crude vessels with a magnitude of 350 m oregon more

Total quay magnitude astatine Chennai Port: astir 5.5 km
Number of docks: 3 (Ambedkar, Jawahar, and Bharathi Docks)
Number of berths: 24

To instrumentality the project, Chennai Port Authority needs to archetypal person biology clearance. In August, the Ministry of Environment, Forest and Climate Change (MoEF&CC) granted the Terms of Reference (ToR) for carrying retired the superior dredging work. In the ToR, the Ministry has directed Chennai Port Authority to bash assorted studies, including an hydrodynamics survey connected the interaction of dredging, the effect of dredging and dumping activities connected the coastline, if the task volition impact marine ecology and biodiversity and the work’s effect connected the erosion and accretion astatine the rima of the creek located adjacent to the site.

Officials said they would soon name a advisor for conducting the recommended studies on with situation interaction appraisal studies and assistance the authorities get Environmental Clearance from the MoEF&CC, New Delhi, and Coastal Regulation Zone Clearance from the State Coastal Zone Management Authority.

Published - November 03, 2025 08:33 p.m. IST

Read Entire Article