Census: Pilot project of house-listing begins in Bengaluru’s J.P. Park ward; centre officials review app testing

6 months ago 2
ARTICLE AD BOX
A record  photograph  of radical   successful  Varanasi. The house-listing process   arsenic  portion  of the nationalist  Census, scheduled to beryllium  completed crossed  the state  successful  2026, began in prime   locations.

A record photograph of radical successful Varanasi. The house-listing process arsenic portion of the nationalist Census, scheduled to beryllium completed crossed the state successful 2026, began in prime locations.

A aviator workout to trial a caller mobile exertion developed for the 2027 Census is nether mode successful J.P. Park ward nether the North Corporation.

The house-listing process, scheduled to beryllium completed crossed the state successful 2026, began in prime locations to measure the app’s accuracy, usability, and field-readiness. 

J.P. Park is 1 of 3 sites chosen successful Karnataka for the proceedings run. The exercise, being carried retired nether the supervision of Corporation Commissioner Pommala Sunil Kumar, began connected November 10 and volition continue until November 30. A full of 83 enumerators, 16 supervisors, and 1 complaint serviceman person been deployed for the ward-level operation. 

Enumerators are visiting each household successful their allotted blocks, collecting required details digitally and verifying entries. Senior officials, Assistant Directors Jeetendra Sharma and Aakash Devra from the Office of the Registrar General and Census Commissioner, visited the ward connected Tuesday to reappraisal progress. They examined the methodology used, the functioning of the mobile app, and the coordination betwixt tract unit and residents. 

Published - November 26, 2025 12:22 americium IST

Read Entire Article