BMTC imposes ₹25 crore in penalties on EV bus operators amid rising safety concerns

7 months ago 3
ARTICLE AD BOX

The Bengaluru Metropolitan Transport Corporation (BMTC) has imposed penalties of ₹25 crore connected electrical autobus operators implicit the past 2 years, pursuing recurring information lapses, method failures, and violations of contractual obligations.

Four backstage companies presently run astir 1,500 electrical buses nether the Gross Cost Contract (GCC) model.

Speaking to The Hindu, Minister for Transport Ramalinga Reddy said that the fines were a effect of ‘continued non-compliance’ with operational standards and repeated incidents involving the BMTC’s electrical fleet.

“More than ₹25 crore successful penalties has been levied connected 4 backstage companies for failing to conscionable contractual show requirements,” helium said.

Rising accidents

The BMTC’s electrical buses person been progressive successful respective accidents successful caller months. Officials said the vehicles often endure from artillery malfunctions and failures successful cardinal physics systems, including infotainment units, air-conditioning components, braking and suspension technologies.

In galore cases, buses stalled successful the mediate of the road, disrupting postulation and posing information risks to passengers and motorists. A elder BMTC authoritative noted that mediocre attraction and inadequate method enactment from operators were among the superior reasons for predominant work interruptions.

In effect to the emergence successful accidents, the BMTC has begun grooming electrical autobus drivers internally. Drivers employed by backstage operators are present required to acquisition a three-day programme astatine the BMTC Training Centre successful Vaddarahalli. “The people includes lessons connected accent management, wellness awareness, harmless driving techniques, postulation rules, and guidelines for operating EVs successful some rainy and adust conditions. So far, 150 drivers person completed the training,” the authoritative explained.

Meanwhile, Mr. Reddy said the BMTC precocious held a gathering with the 4 backstage operators to emblem wide concerns, including rapidly depleting batteries, deployment of inadequately trained drivers, inconsistent operator management, and delays successful wage payments. “Strict instructions person been issued to guarantee that these issues bash not recur. We person besides asked operators to summation the fig of trained drivers, and the effect has been positive,” helium said.

Published - November 27, 2025 08:37 p.m. IST

Read Entire Article