Raising superior interest implicit the mediocre information of the city’s lakes, the Mysore Grahakara Parishat (MGP) has alleged that untreated sewage continues to travel into respective large waterbodies contempt important investments successful sewage absorption infrastructure. The civic organisation has urged the authorities to prioritise sewage attraction implicit large-scale infrastructure projects.
The MGP said it has been receiving an expanding fig of complaints regarding water contamination crossed Mysuru. The organisation warned that the city’s sewage situation is worsening and poses a superior menace to nationalist wellness and the environment.
Highlighting the information of respective metropolis lakes, the MGP said that the Hebbal Lake continues to person untreated sewage contempt reported investments exceeding ₹150 crore by the Infosys Foundation and the installation of a Sewage Treatment Plant (STP). There person been complaints of persistent foul odours astir the lake.
The Lingambudhi Lake, managed by the Forest Department, has been affected by sewage inflow from surrounding areas. According to the MGP, section activists person raised the contented with MLA G.T. Deve Gowda.
At Thipparayanakere, the organisation alleged that backstage developers failed to fulfil commitments related to sewage absorption earlier handing implicit residential plots. The lake’s STP is reportedly non-functional contempt repeated complaints.
The MGP further claimed that sewage inflow has resumed astatine the Karanji Lake, nether the power of Mysuru zoo, affecting its ecosystem and birdlife. While sewage discharge from Padavarahalli into Kukkarahalli Lake has mostly been stopped, it continues to participate the water done stormwater drains during rainfall, it stated successful a property merchandise present connected Monday.
Describing the concern arsenic a “systemic failure”, the MGP referred to a caller gathering successful which Regional Commissioner and Mysuru City Corporation Administrator Nitish Patil reportedly acknowledged that Mysuru would necessitate astir ₹1,500 crore to code its sewage challenges.
The organisation noted that the city’s existing infrastructure tin dainty lone 150 cardinal litres per time (MLD) of sewage, portion Mysuru receives astir 350 MLD of h2o supply. “As a result, astir 200 MLD of sewage remains untreated and yet flows into lakes and different waterbodies,” the MGP claimed.
The MGP criticised what it described arsenic inadequate authorities backing for sewage management, stating that lone astir ₹50 crore is allocated annually for the purpose. The metropolis lacks semipermanent sewage absorption program contempt projections that Mysuru’s colonisation could triple by 2050.
Questioning the government’s priorities, the organisation pointed retired that the authorities is implementing the projected ₹4,200 crore flyover task from Field Marshal K.M. Cariappa Circle (Metropole Circle) to Lingadevarakoppal adjacent Yelwal, portion captious sewage-related issues stay unresolved.
Calling for urgent action, the MGP urged citizens to question sewage absorption astatine the forefront of civic planning. It besides appealed to Mysuru’s engineering colleges to undertake probe aimed astatine uncovering solutions not lone to the city’s sewage problems but besides to the challenges facing the 5 affected lakes.

1 hour ago
1



