Adasivayal villagers successful Sivaganga staged a protestation extracurricular District Collector bureau present connected Monday demanding repair of the colony roads.
The villagers alleged the roadworthy had not been repaired for much than 15 years now.
The 7-km colony roadworthy which branches disconnected from the roadworthy from Devakottai to Kottur astatine Nainavayal connects Parambakudi.
The peculiar subdivision roadworthy would beryllium utilized by radical from 10 villages, including Adasivayal, Sendalpiriyan, Thalaikkudi, Kallurani, and Sirumadai.
Of the 7-km road, the 3-km agelong of this roadworthy from Nainavayal to Adasivayal has not been repaired for 15 years and is successful a severely dilapidated condition, complained roadworthy users.
S. Selvam, 1 of the protesters, said mud from the banks of the Kottur vessel is dispersed crossed the road.
“During the rainy season, vehicles utilizing this roadworthy slip, starring to accidents. The section residents person been consistently submitting petitions demanding the road’s repair,” helium added.
“Officials took steps to repair the road. But owed to the engagement of a ruling enactment member, the repair enactment is being obstructed,” helium said.

8 months ago
3






