Demanding the contiguous removal of ungraded dumped successful the Kottooli wetlands, activists of the Sarovaram Environment Protection Committee staged a protestation astatine the tract connected Thursday (December 18), condemning the alleged nonaccomplishment of the authorities to enforce orders to support the municipality biodiversity hotspot during the Vijil execution investigation.
The organisation alleged that astir 46 loads of ungraded were deposited successful the wetlands connected August 29 by the constabulary arsenic portion of the grounds postulation process. The lawsuit dates backmost to 2019, erstwhile V. Vijil, a nonmigratory of Elathur, went missing. It was reopened precocious aft constabulary recovered that helium had allegedly died of a cause overdose, pursuing which his friends had reportedly buried his assemblage successful the Kottooli wetlands adjacent Sarovaram Biopark. The caller constabulary cognition successful the wetlands progressive searches for skeletal remains and evidence, during which ungraded was dumped successful the area.
The Kottooli wetlands, dispersed crossed Vengeri, Kottooli and Chevayur villages, successful Kozhikode city, person precocious been astatine the centre of respective complaints that led to enactment by statutory authorities. In October 2025, the State Wetland Authority Kerala (SWAK) directed the District Collector and the Kozhikode Corporation to strictly enforce the Wetlands (Conservation and Management) Rules, 2017, noting that the wetland is listed successful the National Wetland Inventory and Assessment (2011).
“The 85,000 sqft Calicut Sarovaram Trade Centre that we spot contiguous is inactive functioning without immoderate valid licence. Survey fig 73/1 was deliberately shown arsenic portion of the gathering licence to prevention this amerciable construction. There were galore attempts to support the owner, but due to the fact that our organisation stood firm, those attempts failed,” said K. Ajaylal, president of committee.
Earlier this month, the Kerala High Court besides observed that complaints regarding threats to the Kottooli wetlands could not beryllium ignored, informing that delays successful protecting the country could origin imperishable biology damage. The tribunal noted that the wetland is being considered for Ramsar tract presumption and posted the substance for further proceeding successful January.
Previously, the Kozhikode metropolis constabulary main had reportedly assured the committee that the ungraded would beryllium removed erstwhile the grounds postulation process was complete. However, the committee members pointed out, nary enactment has been taken truthful far.
They further alleged that the country wherever the ungraded was dumped is present being utilized arsenic a parking abstraction for schoolhouse buses, compounding to the harm to the wetland. The organisation would intensify its protests if the ungraded is not removed and enactment to forestall further harm is delayed, Mr. Ajaylal said.

6 months ago
1




