27-storey landmark takes shape at Central Square, to be ready in 2027

3 months ago 1
ARTICLE AD BOX
The plan  incorporates immoderate   elements of Indo-Saracenic benignant   of architecture, features a solid  façade, and reflects the code    of surrounding practice  buildings. 

The plan incorporates immoderate elements of Indo-Saracenic benignant of architecture, features a solid façade, and reflects the code of surrounding practice buildings. 

The 27-storey Central Tower, which is being constructed astatine the engaged junction other the Chennai Central Railway Station, volition beryllium acceptable by mid-2027.

Coming up astatine Central Square — modelled connected the lines of London’s Trafalgar Square, Moscow’s Red Square and New York’s Times Square — the ₹350-crore, 119-metre-tall gathering has been designed arsenic 1 of the iconic landmarks, lodging everything from a edifice and bureau abstraction to a multiplex.

On-ground walkways

Dedicated on-ground walkways volition nexus the operation to Park Town MRTS presumption and suburban railway station. The basement of the operation volition beryllium connected to the Chennai Central Metro Rail station.

After the Chennai Metro Rail’s designer designed the building, the elevation was presented to a high-level committee of the State government, which approved it aft aggregate meetings.

According to officials of the Chennai Metro Rail Limited (CMRL), the Central Tower was designed successful a mode that blends it with the surrounding practice structures specified arsenic the Chennai Central Railway Station, Victoria Public Hall, and the Ripon Buildings.

“While the Indo-Saracenic benignant of architecture is not adopted per se, we person captured immoderate of its elements. We person besides added a solid façade to supply a scenic presumption of the metropolis and the sea. This gathering is situated astatine a vantage point, surrounded by different practice structures, and hence, we tried to incorporated elements from these buildings. The bottommost information of the gathering is simply a nationalist space; we utilized colonnades [an constituent of the Indo-Saracenic style] arsenic portion of the gathering plan from present till the 5th floor,” said an authoritative of C.R. Narayana Rao (Consultants) Private Limited, the architect.

“Above that comes the bureau space. We person utilized agelong columns and punched windows for a monumentality effect. The Tower volition not person a dome connected apical arsenic radical whitethorn not comprehend it astatine this height. Instead, we volition elevate the mediate of the gathering to springiness it a crown effect. This operation volition basal tall, portion reflecting the code of the neighbouring practice buildings. The solid façade volition lone accentuate the monumentality of the tower,” helium said.

The CMRL officials said that astir 20% of the enactment has been completed. “We person completed the basement parking and are moving connected the archetypal floor. Thirty months from the grant of the contract, the operation volition beryllium ready,” an authoritative said.

After that, the interior enactment volition beryllium done, and subsequently, contracts for assorted firms — beryllium it for mounting up hotels, offices oregon different retail outlets — volition beryllium awarded.

“This country predominantly has achromatic fabric soil, which is simply a clay-rich soil. Building a operation successful specified a determination is rather challenging. The heap of the operation goes arsenic heavy arsenic 25 m-30 m,” a root said.

Parking space

The operation has been designed with a sprawling underground parking space, which measures 24,154 sq.m and tin accommodate 586 carsand 1,652 two-wheelers.

The CMRL proposes to acceptable up a multiplex and retail outlets connected the archetypal 4 floors. Offices volition travel up till the 24th floor. While the 25th floor has been devoted to the work area, the apical 2 floors volition location a rooftop hotel, spanning an country of 6,403 sq.m.

The Central Square, which was announced successful 2015, person seen a multitude of changes, earlier being opened successful 2022. 

Published - February 07, 2026 11:55 p.m. IST

Read Entire Article