A 36-metre-tall span equivalent to a 12-storey gathering is being constructed implicit the Sabarmati stream successful Ahmedabad arsenic portion of the Mumbai-Ahmedabad slug bid project, officials astatine National High Speed Rail Corporation Limited (NHSRCL) has said.
The 480-metre-long span is being built alongside the Western Railway’s Ahmedabad-Delhi main line. It lies astir 1 km from the Sabarmati slug bid presumption and astir 4 km from the Ahmedabad station.

1 month ago
1




